Laserfiche WebLink
Tamme Bishop <br />Page 2 <br />1/22/2019 <br />Construction at the loadout will be delayed until the McClane Canyon Mine obtains a coal sales <br />contract or another mine shows interest in using the site. <br />This concludes the Division's review of the 2018 Annual Reclamation Report for the Fruita <br />Loadout. If you have any questions, please contact me at (303)-866-3567 x8144. <br />Sincerely, <br />Clayton Wein <br />Environmental Protection Specialist <br />clayton.wein@state.co.us <br />aw oIF <br />555 Street Address, Room 555, Denver, CO 55555.5555 P 555.555.5555 <br />t <br />