My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-22_REPORT - C2010088
DRMS
>
Day Forward
>
Report
>
Coal
>
C2010088
>
2019-01-22_REPORT - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 10:22:57 AM
Creation date
1/23/2019 9:34:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Report
Doc Date
1/22/2019
Doc Name
Annual Hydrology Report Adequacy Review
From
DRMS
To
Tamme Bishop & J.E. Stover & Associates
Annual Report Year
2018
Permit Index Doc Type
Hydrology Report
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />January 22, 2019 <br />Tamme Bishop <br />J.E. Stover and Associates <br />2352 N 7th Street, Unit B <br />Grand Junction, CO 81501 <br />RE: Fruita Loadout, C-2010-088 <br />2018 Annual Hydrology Report Review <br />Dear Tamme, <br />The Division of Reclamation, Mining and Safety (the Division) has completed the review of the <br />2018 Annual Hydrology Report (AHR) for the Fruita Loadout. The report was received by the <br />Division on January 16, 2019, thank you for your timely submittal. The Division finds the 2018 <br />AHR to be in compliance with the following Rules: <br />Rule 4.05.13(1), (2), (3) and (4), the approved Permit Application Package and the Probable <br />Hydrologic Consequences (PHC). During the calendar year of 2018 no surface disturbance was <br />created at the Fruita Loadout. With the approval of TR -I (Technical Revision No. 1) on October <br />10, 2012, all water monitoring was suspended. The TR was approved due to the construction at <br />the loadout being delayed until the McClane Canyon Mine (MCM) obtains a sales contract or <br />another mine shows interest in using the loadout. There was no consumptive water use during <br />2018 and no discharge from the site occurred. <br />This concludes the Division's review of the 2018 Annual Hydrology Report for the Fruita <br />Loadout. If you have any questions, please contact me at (303)-866-3567 x8144. <br />Sincerely, <br />Clayton Wein <br />Environmental Protection Specialist <br />clayton.wein@state.co.us <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />Jared S. Polis, Governor i Dan Gibbs, Executive Director I Virginia Brannon, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.