My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-22_REVISION - M1995095
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995095
>
2019-01-22_REVISION - M1995095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:27:03 PM
Creation date
1/22/2019 4:44:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995095
IBM Index Class Name
Revision
Doc Date
1/22/2019
Doc Name
Incompleteness Notice
From
DRMS
To
James Shelton
Type & Sequence
SO3
Email Name
TC1
MAC
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'A <br />WHEREAS, on <br />was granted to <br />Pursuant to which Permit, Permitt <br />EI Paso _ County, Colorado. <br />Permit Nun <br />has engaged in a <br />WHEREAS, The Permit includes and incorporates any and <br />Technical Revisions and/or Conversions. <br />WHEREAS, Permittee wishes to assign the entire Permit, along <br />responsibilities to C ` LV C <br />Successor"), and Prospective Successor wishes to become Success[ <br />F <br />M-1995-095 ("Permit") <br />("Permittee"), <br />fining operation located in <br />subsequent Amendments, <br />ith all associated rights and <br />("Prospective <br />Permittee under the Permit. <br />WHEREAS, Prospective Successor has inspected the mining and reclamation operations and is <br />fully aware of the conditions thereof. <br />WHEREAS, Prospective Successor understands that the ReclamcItion Plan (the "Plan") is an <br />integral part of the Permit and is required by law. Prospective Successor has had an opportunity <br />to thoroughly review the Plan, understands that the Pian has not been completed and that, if <br />--. Prospective Successor becomes Successor, he/she/it will assump full responsibility for the <br />completion of the PIan. <br />NOW THEREFORE, Permittee and Prospective Successor hereby agree, for their own benefit <br />and for the benefit of the State, as follows. <br />Prospective Successor agrees to accept all of the conditions of the Permit, including the <br />condition that the operation remains in compliance with all applica le laws and regulations, and <br />to perform all of the obligations of the Permittee under the Permit. <br />Prospective Successor agrees to complete the Plan, and to assume all liability for the <br />same, as to all areas presently disturbed, as well as to all areas hereafter disturbed. <br />Prospective Successor agrees to submit to the Division of Reclamation, Mining and <br />Safety ("Division"), Performance and Financial Warranties, as req fired by applicable law and <br />regulations, which will be substituted for the Performance and Financial Warranties previously <br />filed by the Permittee, if and when the Division approves a Trairsfer of Mineral Permit and <br />Succession of Operators ("SO") and releases the latter Warranties. <br />Prospective Successor represents to the State that, to t <br />information and belief, it is not in violation of any of the pro <br />Reclamation Act (C.R.S. § 34-32-141 et. seq.) ("Hard Rock Aci <br />C.C.R. 407-1) ("Hard Rock Rules") or the Land Reclamation <br />-8- <br />he best of its knowledge, <br />visions of the Mined Land <br />") and associated Rules (2 <br />Act for the Extraction of <br />
The URL can be used to link to this page
Your browser does not support the video tag.