My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-18_REVISION - M1974086 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974086
>
2019-01-18_REVISION - M1974086 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 2:54:07 AM
Creation date
1/22/2019 11:47:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
Revision
Doc Date
1/18/2019
Doc Name
Request For Amendment To Permit
From
Asphalt Paving Co.
To
DRMS
Type & Sequence
AM4
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ralston Quarry Slop Stability <br /> Zone a— The Central Slope M Zone 3 (delineated on a May 31, 2018, Goo¥ Earth <br /> image reproduced below) tailings extended the farthest down slope but exhibited no <br /> slop failures prior to construction of the retention ponds which appear to have been <br /> constructed in20O/ <br /> \w� <br /> ��\ <br /> /�:� : <br /> \ , <br /> zeta <br /> Slop stability analyses of Zone were performed by analyzing the section indicated <br /> approximately by the black line on the aerial image on the following page. The retention <br /> pond locations are outlined in light blue The area of the slop failure that developed in <br /> early June 2017 ± is outlined in ?± <br /> Job Nc4$m46 GROUND Engineering Consult «$ Inc. Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.