My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-18_REVISION - M1974086 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974086
>
2019-01-18_REVISION - M1974086 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 2:54:07 AM
Creation date
1/22/2019 11:47:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
Revision
Doc Date
1/18/2019
Doc Name
Request For Amendment To Permit
From
Asphalt Paving Co.
To
DRMS
Type & Sequence
AM4
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. The slide area located in the northwest part of the permit area,between the quarry hillside <br /> and the Ralston Reservoir. <br /> The quarry will serve as a sufficient sediment trap for all runoff entering it. The processing area <br /> drains to a collection ditch along the south side of the area, which then drains into a sump north <br /> of the access road, that then drains into a larger sediment pond south of the road. This sediment <br /> pond does not discharge. The slide area has stormwater control systems designed and installed <br /> for it. See Maps C-2 and C-4. <br /> Slide Area Stormwater Control <br /> The slide area stormwater control systems have all been designed to handle the 10-YR 24-HR <br /> 2_3 storm event. This is due to the short-term nature of the disturbance in this area.No mining is <br /> taking place in this part of the site, so the only activity is regrading and reclamation earthwork. <br /> All of the stormwater improvements for this area will be removed promptly following successful <br /> revegetation. Based on Asphalt Paving Co. experience on the site, the slide area should be ready <br /> for release in the next few years. <br /> 2.3.1 Stormwater Runoff Calculations and Improvement Designs <br /> Two areas of disturbance will require stormwater handling in the slide area: the North and South <br /> Areas. The North Area consists of the repaired slide areas themselves, which drains to the west. <br /> The South Area consists of the waste rock embankment of slide material and the topsoil <br /> stockpiles adjacent to the embankment. Maps C-2 and C-4 show these areas. For each area,the <br /> Stormwater controls are outlined below. <br /> The 10-YR, 24-HR runoff was used for all stormwater designs as the disturbance activity will be <br /> temporary, with revegetation taking place promptly. In general,the soil hydrology was assumed <br /> to be that of recently regraded land despite the presence of vegetated areas in the drainage basins. <br /> Ralston Quarry CM l.ewicki and Associates,Pt LC <br /> January 2019 G-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.