Laserfiche WebLink
4. Reclamation Timetable <br /> The timetable for reclamation is shown below in Table E-2. Exhibit L: Reclamation Costs <br /> describes the maximum bond scenario. <br /> Table E-2 Reclamation Timetable <br /> Coumwnts L"glb of th"to <br /> Mining out of north platform above water tunnel 3 <br /> Begin mining the remainder of the reservoir area.Backfill,grade,and <br /> revegetate the north plarform area.Build vegetation islands on the 15-20 <br /> reservoir benches as mining progresses in a portion of the resevoir. <br /> Topsoil and revegetate non-resevoir areas as needed. 1.00 <br /> Total 19-24 <br /> This mine life will vary according to market demands for material. <br /> 5. Revegetation Plan <br /> The final reclaimed use for the Ralston Quarry is a water reservoir and surrounding rangeland. <br /> If any fill stockpile remains more than one growing season, it will be seeded with a fast-growing <br /> vegetative cover to prevent erosion. Topsoil will be ripped or scarified prior to seeding. <br /> When mining operations are completed in areas outside of the water reservoir that require <br /> topsoiling and seeding, these activities will take place promptly. The seed mix listed below will <br /> be applied to these areas as well as the vegetation islands along the reservoir benches. The seed <br /> mix listed below is the same as the one found in the original permit: <br /> Ralston Quarry c:re�Iwwicki and Asmnala PI.IA` <br /> January 2019 E-4 <br />