My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-18_REVISION - M1974086 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974086
>
2019-01-18_REVISION - M1974086 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 2:54:07 AM
Creation date
1/22/2019 11:47:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
Revision
Doc Date
1/18/2019
Doc Name
Request For Amendment To Permit
From
Asphalt Paving Co.
To
DRMS
Type & Sequence
AM4
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Control rooms for the plants, maintenance shops,truck scales, and office trailers are the other <br /> structures on site. Portable toilets and potable water will be brought on site for employee use and <br /> serviced by a contractor. <br /> Maintenance vehicles will visit the site regularly to provide oil, grease, and perform other minor <br /> maintenance on vehicles and equipment. Any major equipment repair work will be performed off <br /> site. <br /> The following list is the best estimate of the required equipment to be used onsite throughout the <br /> mine life: <br /> Equipment <br /> 3.1 <br /> • Front end loaders <br /> • Track Drill <br /> • Skid Steer Loaders <br /> • Motor Grater <br /> • Front Shovel <br /> • Bulldozers <br /> • Off-highway haul trucks <br /> • Highway haul trucks <br /> • Water trucks <br /> • Water Wagon <br /> Employees will park in designated areas near the office trailers. <br /> Blasting is conducted on a regular basis as part of mining activities. The Geotechnical Stability <br /> Exhibit contains further information regarding off site stability in regards to blasting. <br /> No refuse, acid or toxic producing materials are expected to be encountered in this operation. If <br /> these materials are encountered, overburden and topsoil will be placed over the area and mining <br /> will move to a different area. <br /> Ralston Quarry Gn%l.cwicki and As"ciatm PI.IA' <br /> January 2019 D-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.