Laserfiche WebLink
EXHIBIT"A" <br /> BOWER BOND CALCULATION HERTZOG PIT - M-1981-276 <br /> DESCRIPTION EQUIPMENT FLEET SIZE TASK HOURS , <br /> HIGHWALL REDUCTION ANS SITE GRADING DOZER 1 40 $8,000.00 <br /> RIP COMPACTED AREA RIPPER 1 4 $800.00 <br /> TRANSPORT TOPSOIL LOADER 1 40 $6,600.00 <br /> SPREAD TOPSOIL GRADER 1 15 $1,500.00 <br /> REVEGATATE DISTURBED AREAS REVEG 15 AC. 15 $18,750.00 <br /> MOBILIZE MOB 1 30 $3,000.00 <br /> DE-MOBILIZE DE-MOB 1 10 $1,000.00 <br /> TOTAL $39,650.00 <br /> Reclamation nubers are based on all highwalls being graded to not steeper than 3:1 and all reclaimed area as depicted on map <br /> being drill seeded no later than 4/30/19. <br />