My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-16_ENFORCEMENT - M1978208
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1978208
>
2019-01-16_ENFORCEMENT - M1978208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:07:22 PM
Creation date
1/17/2019 11:45:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978208
IBM Index Class Name
ENFORCEMENT
Doc Date
1/16/2019
Doc Name
Consent Agenda Item
From
Elk Creek Sand & Gravel
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/7/18 hand delivered to staff payment for the civil penalties this afternoon together with <br /> some oversize attachments including the drainage plan, site plan and ODP graphic and topo <br /> with certified professional survey indicating compliance w/respect to bench issues and <br /> concerns by staff regarding mining outside of permitted limits.These attachments may occur <br /> duplicate in some cases on reports. Also provided payment for technical revision for weed <br /> control plan <br /> 12/7/18 email DRMS Dropbox link for all files as indicated in <br /> The following email (12/10/18) <br /> 12/7/18 email to DRMS staff regarding providing annual 2018 slope stability and highwall inspection <br /> report query to establish appropriateness of sending supplemental report via email <br /> 12/3/18 staff discussion <br /> 12/1/18 copies of previously submitted documentation to include 2018 Annual report, 2018 proof of <br /> payment annual fees,2018 Annual highwall report etc <br /> 11/30/18 email "Notes"to staff: Report: 2018 Highwall inspection (2 pages) (satisfies staff requirement <br /> regarding annual Slope Stability/highwall inspection requirement) <br /> 11/21/18 2018 Annual report and payment(email and e-permitting site) <br /> 10/13/18 Weed Control Plan Draft for staff review(no response) <br /> 7/12/18 resubmit topo and drone survey to staff, anchored by certified professional surveyor and fine <br /> tune contour interval to demonstrate compliance with original bench design sand to demonstrate <br /> existence of benches in compliance with proposed design originally submitted and further satisfy <br /> concerns by staff that operator was not mining outside of permitted area (no response by staff) <br /> 6/29/18 initial topo mapping and survey contour interval; too coarse to demonstrate compliance <br /> resubmit <br /> 6/12/18 Drone flyover and topo mapping survey by certified surveyor to determine and demonstrate <br /> bench compliance and satisfy regulatory issues arising relating to concerns by staff that Operator was <br /> potentially mining outside of the permit area <br /> 5/4/18 Initial Proof of highwall bench compliance(determined to be insufficient) <br /> 4/24/18 Extension request Approval for time for operator to make corrective action on MV-18-039 <br /> 4/12/18 Proof of signage installed 1 <br /> **other email correspondence,visits, inspections, etc may not be included in this chronology <br /> OPERATOR Elk Creek Sand &Gravel LLC Contact Juliet Moorel6/i <br /> End of Section �' <br />
The URL can be used to link to this page
Your browser does not support the video tag.