My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-17_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2019-01-17_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 12:31:25 PM
Creation date
1/17/2019 10:42:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
1/17/2019
Doc Name
Adequacy Review Response
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
TR84
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Res onset All system components are designed for a peak system flow of 375gpm (0.84 cfs). <br />The inlet pipe will be a short, exposed section of the buried water transfer pipeline which will have grouted footer <br />stones on either side, with the end of the pipe resting on the cascade crest stone. As shown in the detail drawing <br />(Drawing C-11 — Sheet 15 of 15), the cascade system will be keyed into the slope at the top and bottom, with a <br />geotextile base, graded rock bedding, and sized footer stones, which overlap on their downgradient edge for <br />support. System flow will be as noted above, and precipitation flows will be minimal, with essentially all runoff, <br />except direct precipitation on the system, being captured and diverted by the north and south diversion ditches. <br />12. Please provide side slope ratios and spillway crest elevations for each of the system spillways. <br />Response: The drawings reflect 5:H:1 V slopes (based on scale). Note that water levels within the individual <br />cells will be controlled by the AquaDrain structures. Spillway crest elevations (from drawings) are; <br />Cell 1 (Embankment/WOut) — 6,828.5'/6,827.5'/6,826.0' <br />Cell 2 (Embankment/In/Out) — 6,812.0'/6,811.0'/6,809.5' <br />Cell 3 (Embankment/In/Out) — 6,796.0'/6,795'/6,794.0' <br />Cell 4 (Embankment/In/Out) — 6,784.5'/6,783.0'/6,782.5' <br />13. Please provide Sed CAD for treatment system diversion ditches, curve numbers, acreage of the <br />drainage specifying what portion will go to the north and south ditch, and design as per <br />4.05.3(7). <br />Response: The revised SedCAD runs for the new Passive Treatment System location accompany these responses <br />for replacement in Exhibit 49EE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.