Laserfiche WebLink
Cost Summary- For the purpose of Acreage and Bond Reduction <br /> Sprague Red Lyons Permit: M-1981-057 <br /> 1 Backfill Quarry Areas 10 Acres $4,339 <br /> 2 Replace Topsoil 10 Acres $3,585 <br /> 3 Revegetate 10 Acres $13,794 <br /> 4 Backfill Highwall Quarry 1 $479 <br /> 5 Mobilize/demobilize 10 Acres $6,095 <br /> Overhead/Profit $3,454 <br /> Legal/Engineering $1,494 <br /> Total Bond $33,240 <br /> Requested Reduction of Bond $13,810.13 <br />