Laserfiche WebLink
EXHIBIT D <br /> a) Methods of mining will utilize bulldozer equipment and trucks to haul material <br /> b) Earthmoving will utilize scraper and bulldozer equipment <br /> c) There will not be any water diversions or impoundments. N/A <br /> d) Approximately 8 acres will be mined at any one time <br /> e) Timetable <br /> a. Upon notification from state, immediate mining will commence in 8 acres areas in the <br /> Additional Acre area. <br /> b. Top soil to be removed with a scraper and stockpiled to the north of the working area, <br /> to be replaced upon reclamation. Overburden to be removed with a scraper and <br /> stockpiled separately and to the east of the working area. Mining of materials with <br /> bulldozer will commence. 3 Days <br /> c. Mining 28 days. <br /> d. Next 8 acres with same timetable to commence <br /> j) Nature, depth and thickness of the ore body or deposit, see EXHIBIT C.4 <br /> k) Primary commodities to be mined are sand and/or gravel for the use of road base material. <br /> There are no Secondary commodities. <br /> 1) There are no Incidental products to be mined. <br />