My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-11_REVISION - M2014043
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2014043
>
2019-01-11_REVISION - M2014043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:09:39 AM
Creation date
1/11/2019 2:00:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014043
IBM Index Class Name
REVISION
Doc Date
1/11/2019
Doc Name
Adequacy Review Response
From
Environment, Inc.
To
DRMS
Type & Sequence
TR1
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST REVISION Hatchery Pit <br /> M-2014-043 Revised: January 4 , 2019 <br /> The following information is provided to reevaluate the <br /> current bond based on Technical Revision 01 and is based on the <br /> layout of the 2014 worksheet the Division provided during the <br /> intimal permitting process . It is not necessary to import fill <br /> material to complete reclamation on the site . The changes made <br /> to the information previously provided includes removing the <br /> Phase 2 slurry wall and replacing it with a compacted liner and <br /> french drain. We also reduced the costs associated with Phase 1 <br /> slurry wall since it is in place and that area is close to being <br /> backfilled with on-site material . We included a 5% repair cost <br /> estimate since the wall was never certified. The liner and drain <br /> system will be installed in stages but the bond is calculater as <br /> if it were left to the very end. Only grading and shaping of the <br /> upper level highwalls and seeding would be needed on the rest of <br /> the area . The french drain cost is from a quote Albert Frei and <br /> Sons, Inc . has for it' s placement rounded to the number pre- <br /> sented. <br /> The equipment used in the estimate is . <br /> Excavator - Cat 345 <br /> Haul Trucks - Cat 730 <br /> Scarper - Cat 631G <br /> Grader - Cat 14M <br /> Dozer - Cat D8T <br /> Sheeps foot compactor- Cat CP56 <br /> Dewatering Pump data 1-600M, 1511 , 1211suction & discharge hoses <br /> We used the form and numbering from the CosT SumniARY FORm <br /> prepared by the Division, making changes as appropriate . <br />
The URL can be used to link to this page
Your browser does not support the video tag.