Laserfiche WebLink
RECLAMATION COST REVISION Hatchery Pit <br /> M-2014-043 Revised: January 4 , 2019 <br /> The following information is provided to reevaluate the <br /> current bond based on Technical Revision 01 and is based on the <br /> layout of the 2014 worksheet the Division provided during the <br /> intimal permitting process . It is not necessary to import fill <br /> material to complete reclamation on the site . The changes made <br /> to the information previously provided includes removing the <br /> Phase 2 slurry wall and replacing it with a compacted liner and <br /> french drain. We also reduced the costs associated with Phase 1 <br /> slurry wall since it is in place and that area is close to being <br /> backfilled with on-site material . We included a 5% repair cost <br /> estimate since the wall was never certified. The liner and drain <br /> system will be installed in stages but the bond is calculater as <br /> if it were left to the very end. Only grading and shaping of the <br /> upper level highwalls and seeding would be needed on the rest of <br /> the area . The french drain cost is from a quote Albert Frei and <br /> Sons, Inc . has for it' s placement rounded to the number pre- <br /> sented. <br /> The equipment used in the estimate is . <br /> Excavator - Cat 345 <br /> Haul Trucks - Cat 730 <br /> Scarper - Cat 631G <br /> Grader - Cat 14M <br /> Dozer - Cat D8T <br /> Sheeps foot compactor- Cat CP56 <br /> Dewatering Pump data 1-600M, 1511 , 1211suction & discharge hoses <br /> We used the form and numbering from the CosT SumniARY FORm <br /> prepared by the Division, making changes as appropriate . <br />