My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-11_REVISION - M2014043
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2014043
>
2019-01-11_REVISION - M2014043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:09:39 AM
Creation date
1/11/2019 2:00:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014043
IBM Index Class Name
REVISION
Doc Date
1/11/2019
Doc Name
Adequacy Review Response
From
Environment, Inc.
To
DRMS
Type & Sequence
TR1
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION PLANS FOR <br /> HATCHERY PIT PHASE 2 SLOPE LINER <br /> ADAMS, COLORADO <br /> PREPARED FOR: <br /> ALBERT FREI&SONS <br /> P.O.BOX 700 <br /> HENDERSON,CO 80640 <br /> R67W <br /> STEAMBOAT SPRINGS Npp.COLUN6 4 <br /> LOVE,ONGMONT OREEfEY � +�ib; ;. •• <br /> T Q <br /> aka BODIDER <br /> R <br /> d � <br /> SOUTH Q g SHEET INDEX: <br /> GLENNOOD <br /> °GDLDRADOS NGs Y 1 Cover Sheet&Vicinity Map <br /> 7r 2 Existing Conditions and Testhole Locations <br /> Is., CANON°CDY " 3 Summary Logs and Legend <br /> °MONTRosE PueeLgR �B HATCHERY PIT 0 4 Summary Logs <br /> LA TA - - 5 Slope Liner Excavation Plan <br /> T2S 6 Slope Liner Plan <br /> AAA° 7 Cross Sections <br /> CORTEZ DURANGO TwMGAo <br /> 8 Pipeline Drains Overall Plan <br /> 9 North Pipeline Plan and Profile <br /> 10 North Pipeline Plan and Profile(2) <br /> STATE OF COLORADO E88thAVE P 11 South Pipeline Plan and Profile <br /> PROJECT LOCATION MAP NORTH �g� 12 South Pipeline Plan and Profile(2) <br /> SCALE:NONE 13 Details <br /> •�C' �O <br /> RECtIVwmff <br /> JAN 11 1019 <br /> _ DMSioN=:RECLWT*N <br /> MINING AND$q��y <br /> r - <br /> NOTES: <br /> DEERE AND AULT CONSULTANTS,INC.IS NOT A GUARANTOR OF THE <br /> PERFORMANCE OF THE WORK. A <br /> DEERE AND AULT CONSULTANTS,INC.IS NOT RESPONSIBLE FOR SAFETY,IN, <br /> ON,OR ABOUT THE PROJECT SITE,NOR FOR COMPLIANCE BY THE V- ` <br /> APPROPRIATE PARTY WITH ANY REGULATIONS RELATED THERETO. 'A <br /> DEERE AND AULT CONSULTANTS,INC.EXERCISES NO CONTROL OVER THE <br /> SAFETY OR ADEQUACY OF ANY EQUIPMENT,BUILDING COMPONENTS, D 10Do 2000 �` <br /> FORMS,OR OTHER WORK AIDS USED IN OR ABOUT THE PROJECT,OR OVER <br /> THE SUPERINTENDING OF THE SAME. SCALE IN FEET `hf <br /> WRITTEN SCALES ON PLAN ARE FOR FULL SIZED 22"x 34"PLANS AND DO <br /> Y NOT APPLY TO REDUCED PLAN SETS. <br /> KnowwAefe bebw. <br /> 8 CA before you dig. <br /> CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU <br /> DIG,GRADE,OR EXCAVATE FOR THE MARIONG OF <br /> UNDERGROUND MEMBER UTILITIES. HATCHERY PIT PHASE 2 SLOPE LINER <br /> DEERE 8 AULT CONSULTANTS,INC.ASSUMES NO REVISIONS <br /> RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS(HORIZONTAL Cover Sheet&Vicinity Map <br /> AND VERTICAL).THE EXISTING UTILITIES SHOWN ON THIS NO. DESCRIPTION DATE BY <br /> DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE 1 OWNER REVIEW NOV 2018 CJH <br /> INFORMATION.IT IS,HOWEVER,THE RESPONSIBILITY OF THE 2 AGENCY REVIEW NOV2018 CJH D E E R E & A U L T —B.AI—TRD.BInGAauREpe <br /> CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTIUTIES L°N R�LO <br /> E PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION <br /> TEL JO',1.E311098 FAX JD].851.ItlB <br /> ACTIVITIES. DESIGNED BY: CJH APPROVED BY: CJH JOB N0. SHIM: <br /> DRAWN BY: RR DATE: NOV 2018 0247.024.00 1 Of 13 <br /> CHECKED BY: SCALE:AS NOTED CJH <br />
The URL can be used to link to this page
Your browser does not support the video tag.