Laserfiche WebLink
excavated pit - <br />Max. 10,000 ft. <br />haul <br />18" Culvert 230 LF Pipe, corrugated <br />metal (CMP) - <br />18 in. diameter <br />pipe <br />230.00 LF $3.78 $869.63 <br />24" Culvert 120 LF Pipe, corrugated <br />metal (CMP) - <br />24 in. diameter <br />pipe <br />120.00 LF $4.88 $585.48 <br />30" Culvert 100 LF Pipe, corrugated <br />metal (CMP) - <br />30 in. diameter <br />pipe <br />100.00 LF $6.29 $629.10 <br />36" Culvert 15 LF Pipe, corrugated <br />metal (CMP) - <br />36 in. diameter <br />pipe <br />15.00 LF $7.53 $112.98 <br />42" Culvert 160 LF Pipe, corrugated <br />metal (CMP) - <br />48 in. diameter <br />pipe <br />160.00 LF $10.75 $1,720.64 <br />48" Culvert 75 LF Pipe, corrugated <br />metal (CMP) - <br />48 in. diameter <br />pipe <br />75.00 LF $10.75 $806.55 <br />Fencing 330 LF Fencing, chain <br />link, including <br />posts and fabric <br />- to 6 ft. high <br />330.00 LF $2.62 $864.60 <br />Petroleum <br />Contaminated <br />Soil Removal <br />Assume 60 <br />CY <br />Dispose of <br />decontaminated <br />soil - Average <br />60.00 CY $300.00 $18,000.00 <br />Removed Fiber <br />Optic Line <br />2,370 LF Utility Poles, <br />Wood 20' to 0' <br />high (each pole) <br />24.00 EA $214.50 $5,148.00 <br /> <br />Job Hours: 330.00 <br />Subtotal <br />(unadjusted): $81,909.43 <br />Total Cost <br />(adjusted for <br />location): $80,680.79 <br /> <br />