My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-28_GENERAL DOCUMENTS - C1980004
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980004
>
2018-12-28_GENERAL DOCUMENTS - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 3:31:19 PM
Creation date
1/11/2019 9:33:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
12/28/2018
Doc Name Note
For MT8
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
McClane Canyon Mining, LLC
Permit Index Doc Type
Findings
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br /> <br />Task description: Finish Grade All Backfilled Areas <br />Site: McClane Canyon Mine Permit Action: MT8 Permit/Job#: C1980004 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 014 State: Colorado Abbreviation: None <br />Date: 12/27/2018 County: Garfield Filename: 014 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 12M Horsepower: 158 <br />Ripper Attachment: Multi-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $30.73 NA <br />Operating Cost/Hour: $30.60 100 <br />Ripper Ownership Cost/Hour: $2.17 NA <br />Ripper Operating Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $28.69 NA <br />Total Unit Cost/Hour: $92.19 <br />Total Fleet Cost/Hour: $92.19 <br /> <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 6.09 acres <br />Source of estimated acreage: Operator Estimate <br /> <br />HOURLY PRODUCTION <br />Average Grader Speed: 1.50 mph <br />Selected Application: Finish grading (0-2.5 mph) - 1.5 <br />Selected Blade Angle: 30 degrees <br />Effective Blade Length: 10.40 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 8.40 feet <br />Unadjusted Hourly Unit Production: 1.5273 acres/hour <br />Job Condition Correction Factors Site Altitude: 5600 feet <br /> Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.85 (1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: 1.2982 acres/Hour <br />Adjusted Hourly Fleet Production: 1.2982 acres/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 4.69 Hours <br /> <br />Unit cost: <br /> <br />$71.01 <br /> <br />per acre <br /> <br />Total job cost: <br /> <br />$432 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.