My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-28_GENERAL DOCUMENTS - C1980004
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980004
>
2018-12-28_GENERAL DOCUMENTS - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 3:31:19 PM
Creation date
1/11/2019 9:33:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
12/28/2018
Doc Name Note
For MT8
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
McClane Canyon Mining, LLC
Permit Index Doc Type
Findings
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip Backfilled and Rough Graded Areas <br />Site: McClane Canyon Mine Permit Action: MT8 Permit/Job#: C1980004 <br />PROJECT IDENTIFICATION <br />Task #: 008 State: Colorado Abbreviation: None <br />Date: 12/27/2018 County: Garfield Filename: 008 <br />User: TNL <br />Agency or organization name : DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU Horsepower: 405 <br />Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $110.70 NA <br />Operating Cost/Hour: $95.46 100 <br />Ripper Ownership Cost/Hour: $12.36 NA <br />Ripper Operating Cost/Hour: $7.88 100 <br />Operator Cost/Hour: $41.52 NA <br />Total Unit Cost/Hour: $267.92 <br />Total Fleet Cost/Hour: $267.92 <br /> <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 6.70 acres Rip Depth (ft): 2.00 Volume: 21,619 BCY or CCY <br />Source of estimated quantity: Operator Estimate <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA feet/second <br />Area: <br />Average Ripping Depth: 2.63 mph <br />Average Ripping Width: 7.67 degrees <br />Average Ripping Length: 200.00 feet <br />Average Dozer Speed: 88.00 feet <br />Average Maneuver Time: 0.25 feet <br />Production per unit area: 0.838 acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.838 Acres/hr <br />Site Altitude: 5,600 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.70 Acres/hr <br />Adjusted Hourly Fleet Production: 0.70 Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 9.64 Hours <br /> <br />Unit cost: <br /> <br />$385.397 <br /> <br />Per acre <br /> <br />Total job cost: <br /> <br />$2,582 <br />Selected estimating method: Area
The URL can be used to link to this page
Your browser does not support the video tag.