My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-28_GENERAL DOCUMENTS - C1980004
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980004
>
2018-12-28_GENERAL DOCUMENTS - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 3:31:19 PM
Creation date
1/11/2019 9:33:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
12/28/2018
Doc Name Note
For MT8
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
McClane Canyon Mining, LLC
Permit Index Doc Type
Findings
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br /> <br />Task description: Place Three Feet of Cover on Coal Mine Waste Pile <br />Site: McClane Canyon Mine Permit Action: MT8 Permit/Job#: C1980004 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 007 State: Colorado Abbreviation: None <br />Date: 12/27/2018 County: Garfield Filename: 007 <br />User: TNL <br />Agency or organization name : DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 627G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization -machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $102.39 NA NA NA NA NA <br />Operating cost/hour: $125.30 NA NA NA NA NA <br />%Utilization -ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $31.05 NA NA NA NA NA <br />Unit Subtotals: $258.73 NA NA NA NA NA <br />Number of Units: 1 0 0 0 0 0 <br />Group Subtotals: Work: $258.73 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $258.73 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 7,500 CCY Swell factor: 1.250 <br />Loose volume: 9,375 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 2,650 lbs/LCY Struck Volume: 15.70 LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br /> Heaped Volume: 22.00 LCY <br />Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br />Payload Capacity: 19.92 LCY Adjusted Capacity: 18.85 LCY <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.