My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-28_GENERAL DOCUMENTS - C1980004
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980004
>
2018-12-28_GENERAL DOCUMENTS - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 3:31:19 PM
Creation date
1/11/2019 9:33:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
12/28/2018
Doc Name Note
For MT8
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
McClane Canyon Mining, LLC
Permit Index Doc Type
Findings
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDRAULIC EXCAVATOR WORK <br />Task description: Regrade Steep Slope Area South of Shop <br />Site: McClane Canyon Mine Permit Action: MT8 Permit/Job#: C1980004 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado Abbreviation: None <br />Date: 12/27/2018 County: Garfield Filename: 002 <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 324D L 9’-8” Stick Horsepower: 194 <br />Attachment 1: ROPS Cab Weight (MT): 24.85 <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $42.29 NA <br />Operating Cost/Hour: $44.49 100 <br />Operator Cost/Hour: $37.79 NA <br />Total Unit Cost/Hour: $124.56 <br />Total Fleet Cost/Hour: $124.56 <br />MATERIAL QUANTITIES <br />Initial volume: 4,125 CCY Swell factor: 1.250 <br />Loose volume: 5,156 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Load Bucket Capacity <br /> <br />Rated Capacity: 2.26 LCY (heaped) <br />Bucket Fill Factor: 0.975 Sand and gravel (95% - 100%) 0.975 <br />Adjusted Capacity: 2.20 LCY <br />Job Condition Correction Factors Site Altitude: 5600 feet <br /> Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 394.66 LCY/Hour <br />Adjusted Hourly Unit Production: 327.57 LCY/Hour <br />Adjusted Hourly Fleet Production: 327.57 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time: 15.74 Hours <br /> <br />Unit cost: <br /> <br />$0.380 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$1,961 <br /> <br /> <br />Basic Job Condition Description: BELOW AVERAGE <br />Secondary Job Condition within Basic Description: AVERAGE <br />Cycle Time Value: 0.335 minutes <br />Bucket Size Class: Medium
The URL can be used to link to this page
Your browser does not support the video tag.