My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-11_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2019-01-11_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 9:36:10 AM
Creation date
1/11/2019 9:29:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
1/11/2019
Doc Name Note
Interoffice Memo
Doc Name
Adequacy Review
From
Zach Trujillo
To
Brock Bowles
Type & Sequence
TR19
Email Name
ZTT
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />j&7 Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />January 11, 2019 <br />Interoffice Memo <br />New Horizon North (Permit No. C-2010-089) <br />Technical Revision No. 19 (TR -19) <br />Brock, <br />I have reviewed New Horizon North Mine's (NHN) TR -19 for adequacy regarding the provided <br />stability analysis for As -Built updates for Ponds NHN-001 and NH -002 (Ponds). The stability <br />analysis that was provided with TR -19 is the same as what was provided and approved with previous <br />revisions for the original Ponds' As -Built incorporation into the NHN PAP. As per our discussions, <br />NHN's intent is to reduce the size of the Ponds' capacity due to the lack of necessity and to allow for <br />additional progression of reclamation at NHN. After reviewing TR -19, there are no proposed changes <br />to the Ponds' embankments and so all assumptions and parameters used in the original stability <br />analysis remain valid. As long as the integrity of the Ponds' embankments are unaffected during the <br />modification of the Ponds, there should be no stability issues with what is proposed under TR -19. <br />This concludes my review of the above mentioned sections for the NHN's TR -19 review. If you <br />have any questions, feel free to contact me. <br />Sincerely, <br />rmlN�M*,% <br />Zach T. Trujillo <br />Environmental Protection Specialist <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />Jared Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director <br />flF'C-0 <br />H <br />I <br />'F1876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.