Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 003 <br />BULLDOZER WORK <br />Task description: Spread topsoil over disturbed area <br />Site: Eagle -Gypsum Mine Permit Action: TRI l <br />PROJECT IDENTIFICATION <br />Page 1 of 2 <br />Permit/Job#: M1984041 <br />Task #: 003 State: Colorado Abbreviation: None <br />Date: 1/9/2019 County: Eagle Filename: M041-003 <br />User: SJM <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />{CRG) <br />Cost Breakdown: <br />Total unit Cost/Hour: $247.68 <br />Total Fleet Cost/Hour: $495.37 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$110.70 <br />NA <br />Operating Cost/Hour: <br />$95.46 <br />100 <br />Ripper own. Cost/Hour: <br />$0.00 <br />NA <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$41.52 <br />NA <br />Total unit Cost/Hour: $247.68 <br />Total Fleet Cost/Hour: $495.37 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />6,250 <br />Swell factor: <br />1.000 <br />Loose volume: <br />6,250 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />700.0 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: 0% <br />Average site altitude: 7,000 feet <br />Material weight: 1,600 Ibs/LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG.) <br />Material consistency: <br />1.200 <br />CAT HB <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />AVG. <br />