My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-09_REVISION - M1984041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984041
>
2018-01-09_REVISION - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:07:16 PM
Creation date
1/9/2019 4:27:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Revision
Doc Date
1/9/2018
Doc Name
Bond Calculations
From
DRMS
To
American Gypsum
Type & Sequence
TR11
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br />Task description: Regrade 3:1 <br />Site: Eagle -Gypsum Mine Permit Action: TRI l <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 1/9/2019 County: Ea le <br />User: SJM <br />Agency or organization name: DBMS <br />Permit/Job#: M1984041 <br />Abbreviation: None <br />Filename: M041-001 <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 16M _ Horsepower: 297 <br />Ripper Attachment: Multi -Shank Ripper Shift Basis: 2 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization o o <br />Ownership Cost/Hour: $77.19 NA <br />Operating Cost/Hour: $63.34 100 <br />Ripper Ownership Cost/Hour: $4.07 NA <br />Ripper Operating Cost/Hour: $3.53 100 <br />Operator Cost/Hour: $28.84 NA <br />Total Unit Cost/Hour: $176.97 <br />Total Fleet Cost/Hour: $353.94 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 5.80 <br />Source of estimated acreage: TRI 1 <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />acres <br />1.50 <br />mph <br />Finish <br />grading (0-2.5 mph) - 1.5 <br />-1 <br />degrees <br />0.00 <br />feet <br />2.00 <br />feet <br />9.75 <br />feet <br />1.7727 <br />acres/hour <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.85 _ (2sh/d, fay.) <br />Net Correction: 0.8500 multiplier <br />Site Altitude: 6900 feet <br />Adjusted Hourly Unit Production: 1.5068 acres/Hour <br />Adjusted Hourly Fleet Production: 3.0136 acres/Hour <br />JOB TBIE AND COST <br />Fleet size: 2 Grader(s) <br />Unit cost: $117.45 per acre <br />Total job time: 1.92 Hours <br />Total job cost: $681 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.