Laserfiche WebLink
Colorado Department Of Transportation 11/15/2018 <br /> Contract Schedule Page 2 of 7 <br /> Contract ID: C21878 Project(s): NHPP0705-082 <br /> SECTION 0001 ROADWAY <br /> Proposal Approximate Unit Price Bid Amount <br /> Line Item ID Quantity and <br /> Number Description Units Dollars Cents Dollars Cents <br /> 0085 203-00060 52,992.000 <br /> Embankment Material(Complete In CY 15.54 823,495.68 <br /> Place) <br /> 0090 203-01500 40.000 <br /> Blading HOUR 102.60 4,104.00 <br /> 0095 203-01594 150.000 <br /> Combination Loader HOUR 102.60 15,390.00 <br /> 0100 206-00000 3.000 <br /> Structure Excavation CY 550.00 1,650.00 <br /> 0105 208-00002 6,880.000 <br /> Erosion Log Type 1 (12 Inch) LF 3.68 25,318.40 <br /> 0110 208-00023 2,500.000 <br /> Erosion Log(Type 3)(12 Inch) LF 4.20 10,500.00 <br /> 0115 208-00035 3,000.000 <br /> Aggregate Bag LF 5.51 16,530.00 <br /> 0120 208-00046 31.000 <br /> Pre-fabricated Concrete Washout EACH 500.00 15,500.00 <br /> Structure <br /> 0125 208-00060 180.000 <br /> Temporary Slope Drain LF 28.00 5,040.00 <br /> 0130 208-00075 20.000 <br /> Pre-fabricated Vehicle Tracking Pad EACH 1,440.00 28,800.00 <br /> 0135 208-00103 200.000 <br /> Removal and Disposal of Sediment HOUR 45.00 9,000.00 <br /> (Labor) <br /> 0140 208-00105 20.000 <br /> Removal and Disposal of Sediment HOUR 90.00 1,800.00 <br /> (Equipment) <br /> 0145 208-00106 236.000 <br /> Sweeping(Sediment Removal) HOUR 95.00 22,420.00 <br /> 0150 208-00107 40.000 <br /> Removal of Trash HOUR 45,00 1,800.00 <br /> 0155 208-00207 472.000 <br /> Erosion Control Management DAY 425.00 200,600.00 <br /> 0160 208-00300 319.750.000 <br /> Temporary Berms LF 0.48 153,480.00 <br /> 113 <br /> tit SC A;SvT a e f wa ._s.ac.� -..roil► <br />