My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-09_PERMIT FILE - M2019002
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019002
>
2019-01-09_PERMIT FILE - M2019002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 2:38:04 AM
Creation date
1/9/2019 4:08:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019002
IBM Index Class Name
Permit File
Doc Date
1/9/2019
Doc Name
Application
From
Castle Rock Construction Company of Colorado
To
DRMS
Email Name
ERR
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br /> RECLAMATION PLAN <br /> OPERATION NAME: STRODE PIT <br /> COUNTY: Kit Carson <br /> OPERATOR: Castle Rock Construction Co. of Colorado, LLC <br /> 1. 4 - 6" of topsoil is currently present on the site and will be stripped and <br /> stockpiled. <br /> 2. The final slopes will be a maximum of 4:1 or flatter. Final slopes, both new and <br /> existing that are disturbed, will be reclaimed, seeded and mulched utilizing the <br /> attached seed and mulch plan that is specified on the highway project six miles <br /> from the pit. No blanket or mulch tackifier is anticipated to be necessary. <br /> 3. The final use of the pit is rangeland. <br /> 4. No trees or shrubs will be removed from the rangeland. <br /> 5. No streams, roads or building will remain after reclamation. <br /> 6. The haul road will be returned to existing contours and to the use of rangeland. <br /> 7. By salvaging and placing all existing topsoil as described above, the new <br /> vegetation on the slopes will be greater than the extent of cover of the existing <br /> vegetation on the surrounding areas. <br /> 8. The seeding will be done by the fall of 2020, probably at the same time as the <br /> roadway project. A preparation and seeding list are attached in this Exhibit. The <br /> site will be chiseled and disced after topsoiling and prior to seeding. <br /> 9. Prior to the seeding and mulching process, the reclaimed soil will be tested to <br /> determine the need for fertilizer. These results will be supplied to the Division <br /> prior to actual application for approval <br /> 10. The following seeding plan and all the conditions required in that plan will be <br /> utilized in the reclamation of the pit as necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.