My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-09_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-01-09_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 7:04:30 AM
Creation date
1/9/2019 12:12:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
1/9/2019
Doc Name
Adequacy Review Response
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
TR129
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRI-STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. <br /> HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233-0695 303-452-6111 <br /> January 7,2019 <br /> Mr.Zach Trujillo <br /> Environmental Protection Specialist <br /> Colorado Division of Reclamation,Mining&Safety <br /> Department of Natural Resources cCctVEp <br /> 1313 Sherman Street, Room 215 RG G <br /> Denver CO 80203 <br /> RE: Colowyo Coal Company L.P. O 'nQt1, <br /> Permit No. C-1981-019 DNiS1� Igo SAFE <br /> Technical Revision No. 129 ' <br /> Adequacy Response <br /> Dear Mr.Trujillo, <br /> Tri-State Generation and Transmission Association Inc. (Tri-State),is the parent <br /> company to Axial Basin Coal Company,which is the general partner to Colowyo Coal Company <br /> L.P. (Colowyo). Tri-State received your adequacy letter dated December 31,2018 and is <br /> providing the response below to your adequacy concern on behalf of Colowyo. The Colowyo <br /> Mine operates under Permit No. C-1981-019. <br /> 1. For the Division's review,please provide an updated Fill Survey Monument Report and <br /> Graphs to include up to the 2018 Fourth Quarter. These reports and graphs are normally <br /> provided with Colowyo's Annual Reclamation Report under Figures 3-2 and 3-3. <br /> Response: The West Pit Fill Survey Monument Graphs included under the TR-129 <br /> application,already include the fourth quarter 2018 data. The graphed data for the fourth <br /> quarter survey(11/8/2018)is graphed just passed the 11/1/2018 line on the horizontal <br /> axis. <br /> 2. In the provided document,the West Pit Fill Final Construction Report, it states that the <br /> design,instrumentation,and monitoring requirements for the West Pit Fill are discussed <br /> under Volume 5B, Exhibit 19, and Section IIB.This appears to be a typo,since this <br /> reference is for the Section 16 Fill and the West Pit Fill is discussed under Volume 5B, <br /> Exhibit 19, and Section IB. Please provide an updated West Pit Fill Final Construction <br /> Report with the correct reference. <br /> Response: The citation that was noted to be incorrect has been revised and a new West <br /> Pit Fill Final Construction Report(cover page only)has been provided. <br /> 3. After reviewing the provided Change Sheet for TR-129,there are notes for revised <br /> Volume 5B,pages I a-1 through I a-4 however these revised pages were not included <br /> with the TR-129 application. Please provide the proposed Volume 5B,pages I a-1 <br /> through I a4. <br /> AN EQUAL OPPORTUNITY IAFFIRMA77VE ACTION EMPLOYER CRAIG STATION ESCALANTE STATION NUCIA STATION <br /> P.O.BOX 1307 P.O.BOX 977 P.O.BOX 698 <br /> A Touchstone EneWCooperative 1 CRAIG,00 11162&1307 PREWITT,NM 87018 NUCLA,CO 81421.116„ <br /> 970-8244111 909-8767271 970./164-7316 <br />
The URL can be used to link to this page
Your browser does not support the video tag.