Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Rom O'' — ay "t -,�so/z w-« R�F�L�� 3�; P�es✓5o�er�o <br /> Z-A57-ky VOKIAI& 13CCiArn,97-1o1v, TYC AAMOXIA417-- <br /> 17aPS61L 9OA7-61 /3Ur/dN VC10061-1 Pry/t,1, r.3 ri11K U <br /> To .&. ry/e A L Ok PV TD 01K <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): NZA <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> AU a ryc>/y ®F 7-9t/VrH£s a /-:2,, rs lyfc,L <br /> *9 FogM £:0 AFT£R iW6t / 5 CO1nOO?L9TgO IhVD <br /> _11CRe, cs Ive FulUGP5,/? iNTeR�s i F-oR 1yoR g, <br /> G6trPi-9 TirD /N A Tim £ I,!!j 01411IM-2 <br /> Form 2—Public File Page 9 of 14 <br />