My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-03_REVISION - M1977300 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2019-01-03_REVISION - M1977300 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2019 12:53:42 PM
Creation date
1/3/2019 11:24:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Revision
Doc Date
1/3/2019
Doc Name
Adequacy Review Response
From
Colorado Legacy Land
To
DRMS
Type & Sequence
TR27
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Barium Chloride <br /> (Radium Precip.) FC\ <br /> 201// <br /> U <br /> — <br /> II D4 low& Ow <br /> P-2001 <br /> TK-2004 <br /> (PT ` 6PT� <br /> __0/ Backfill Slurry Tank \02 Backfill Slurry Tank <br /> 233 CLL2018-1DI601 , I 20,000 gal I 20,000 gal <br /> Pro 100 RO(A)Concentrate o o rFQ1 <br /> 234 CLL2018-1D1601 H I ,203, <br /> Pro 100 RO(B)Concentrate I I <br /> C 4 IF- TK-2001 H ID< C(1 IF- TK-2002 <br /> 236 CLL2018 101601 , ► �ld From 60 HP Pump <br /> Treatment Building Spill Pump 0 <br /> 0 <br /> lo o1 <br /> 235 CLL2018-101601 , Ow <br /> Recirculation Line <br /> 0 0 <br /> Valley Floor Sumps , C4 OC T 1110. Lo—o—o7 0— —0-0-0 202 <br /> / <br /> ( FQi o \/ <br /> 0/ o <br /> lkl-..U1 <br /> 0 0 <br /> P-2003 <br /> 0 I Booster ter Pump 1 <br /> O <br /> O <br /> O <br /> I FCS0 o— —o—o-0 204 <br /> I 1110. 261 CLL2018-101601 , x <br /> o <br /> I*1-0P.6: RO Units <br /> _ <br /> P-2004 <br /> Booster Pump 2 <br /> FC\ , FQ 1 <br /> 2v \ 202 / o <br /> _� Mlw Underground Injection ' 3 <br /> 0 <br /> 0 <br /> P-2002 <br /> 3 <br /> C <br /> 3 <br /> j <br /> 0 <br /> 0 <br /> This drawing has been prepared for the use of Alexco v <br /> Environmental Group's client and may not be used,reproduced SChWartZWalder WWTP G <br /> or relied upon by third parties,except as agreed by Alexco Existing Conditions 2 <br /> Environmental Group and its client,as required by law for use of <br /> governmental reviewing agencies.Alesw Environmental Group Q) Drawing No.:CLL2018-1 DI602 <br /> accepts no responsibility,and denies any liability whatsoever,to S <br /> any party that modifies this drawing without Alexco <br /> Environmental Group's express written consent A l_G It V G 3 <br /> VIROiAME,.- ... Storage & Discharge Tanks t <br /> GFt0U <br /> Piping& Instrumentation Diagram <br /> 2018-12-07 Issued for Review A KAB — <br /> DATE ISSUE/REVISION ,,,. DRW. APP. REVISION A 2018-12-07 PROJECT No.:CLL-2018 <br /> DRAWN BY:KB DESIGNED BY:PD REVIEWED BY:EL <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.