Laserfiche WebLink
Max. 10,000 ft. <br />haul <br />Sasser <br />Substation <br />12'x40'x10' Bldg. (SN) <br />demo./on -site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />4,800.00 CF $0.20 $974.40 <br /> - Floor 10'x40'x6" Demo. and on - <br />site disposal in <br />existing pit, 6 in. <br />thick - Max. <br />10,000 ft. haul <br />480.00 SF $0.83 $397.92 <br /> - Footers 3'x1.5'x104 <br />LF <br />Demo. and on - <br />site disposal in <br />existing pit, 1.5 <br />ft. x 3 ft. - Max. <br />10,000 ft. haul <br />104.00 LF $7.85 $816.40 <br />Line Power <br />Substation <br />10'x20'x8' Bldg. (SN) <br />demo./on -site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />1,600.00 CF $0.20 $324.80 <br />Crusher/Screener 25'x15'x25' Bldg. (SN) <br />demo./on -site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />9,375.00 CF $0.20 $1,903.13 <br /> - Wing Walls 2 (15'x8'x6") Demo. and on - <br />site disposal in <br />existing pit, 6 in. <br />thick - Max. <br />10,000 ft. haul <br />240.00 SF $0.83 $198.96 <br /> - Floor 10'x25'x6" Demo. and on - <br />site disposal in <br />existing pit, 6 in. <br />thick - Max. <br />10,000 ft. haul <br />250.00 SF $0.83 $207.25 <br />Collection <br />Conveyor <br />40 LF Conveyor, <br />Horizontal Belt <br />24" Belt, 41.5' <br />Length <br />1.00 EA $2,100.00 $2,100.00 <br />Stacker <br />Conveyor <br />110 LF Conveyor, <br />Horizontal Belt <br />24" Belt, 61.5' <br />Length <br />2.00 EA $2,825.00 $5,650.00 <br />10,000 Gallon <br />Water Tank <br />10,000 <br />Gallons <br />Excavate and <br />load tank onto <br />trailer, non - <br />leaking - 9,000 <br />gal. to 12,000 <br />gal. <br />1.00 EA $1,300.00 $1,300.00 <br />Water/Septic <br />Tank <br />3,750 Gallons Excavate and <br />load tank onto <br />trailer, non - <br />leaking - 3,000 <br />gal. to 5,000 <br />gal. <br />1.00 EA $583.00 $583.00