My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-28_REVISION - C1980004 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2018-12-28_REVISION - C1980004 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 8:19:05 AM
Creation date
1/2/2019 1:15:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
12/28/2018
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
McClane Canyon Mining, LLC
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 015 – Stream Channel Erosion Protection $57,580.00 <br /> <br /> <br />Riprap protection for channel R-2, R-5, R-6 and R-8 require 650 cu. yrd of riprap for slope protection (from RS Means <br />Building Construction Cost Data, 2018 Edition; Section 31 37 13.10 0200) has a cost of $76.30/cubic yard. <br /> <br />(650 cu. yd.) x ($76.30/cu.yd.) = $49,595.00 <br /> <br />Erosion blanket protection for channels R-1, R-3, R-4, R-7 and R-12 requires 1912 sq. yd. of blanket. The cost of the <br />blanket including installation is $1.41/sq. yd. (from RS Means Construction Cost Data, 2018 Edition; Section 31 25 14.16 <br />0020). <br /> <br />(1,912 s q. yd.) x ($1.41/sq. yd.) = $2,695.92 <br /> <br />Total erosion control = ($49,595.00) + ($2,695.92) = $52,290.92 <br /> <br />Using 1 Cat 324D L Excavator for 40 hours (1 week); $124.56 x 40hrs = $4,982.40 <br /> <br />Stream Channel Erosion Protection – Total Cost <br /> <br />($52,290.92) + ($4,982.40) = $57,273.32 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.