My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-28_REVISION - C1980004 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2018-12-28_REVISION - C1980004 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 8:19:05 AM
Creation date
1/2/2019 1:15:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
12/28/2018
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
McClane Canyon Mining, LLC
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br /> <br />Task description: Place Three Feet of Cover on Coal Mine Waste Pile <br />Site: McClane Canyon Mine Permit Action: MT8 Permit/Job#: C1980004 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 007 State: Colorado Abbreviation: None <br />Date: 12/27/2018 County: Garfield Filename: 007 <br />User: TNL <br />Agency or organization name : DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 627G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization -machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $102.39 NA NA NA NA NA <br />Operating cost/hour: $125.30 NA NA NA NA NA <br />%Utilization -ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $31.05 NA NA NA NA NA <br />Unit Subtotals: $258.73 NA NA NA NA NA <br />Number of Units: 1 0 0 0 0 0 <br />Group Subtotals: Work: $258.73 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $258.73 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 7,500 CCY Swell factor: 1.250 <br />Loose volume: 9,375 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 2,650 lbs/LCY Struck Volume: 15.70 LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br /> Heaped Volume: 22.00 LCY <br />Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br />Payload Capacity: 19.92 LCY Adjusted Capacity: 18.85 LCY <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.