My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-28_REVISION - C1980004 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2018-12-28_REVISION - C1980004 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 8:19:05 AM
Creation date
1/2/2019 1:15:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
12/28/2018
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
McClane Canyon Mining, LLC
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
036 Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE 1 5.55 $8,133.00 <br />037 Mobilize/Demobilize Equipment for Pond <br />Removal <br />MOBILIZE 1 4.55 $2,407.00 <br />038 Mobilize/Demobilize Equipment for Site <br />Maintenance <br />MOBILIZE 1 9.55 $10,750.00 <br />039 10 year site maintenance SITEMAINT <br />ENANCE <br />1 0.00 $34,540.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />964.68 <br /> <br />$345,050 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $6,970.01 <br />Performance bond: 1.05 Total = $3,623.03 <br />Job superintendent: 482.32 Total = $35,233.48 <br />Profit: 10.00 Total = $34,505.00 <br /> TOTAL O & P = $80,331.52 <br /> CONTRACT AMOUNT (direct + O & P) = $425,381.52 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 Total = 500.00 <br />Engineering work and/or contract/bid preparation: 6.59 Total = $28,032.64 <br />Reclamation management and/or administration: 4.89 $20,801.16 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $129,665.32 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $474,715.32 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.