Laserfiche WebLink
December 17, 2018 C-1981-008/New Horizon Mine BFB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 4 of 4 <br /> <br /> Photo 2 – Trench Drain Pipe by Pond 13 <br /> Photo 3 – Topsoil Redistribution by the Facilities Area <br />Tee Installed in <br />Trench Drain <br />Pipe <br />Trench Drain <br />Shut-off Valve <br />Former C18 <br />Ditch <br />Former Coal <br />Stockpile Area <br />Pond 18