My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-28_REVISION - C1980004 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2018-12-28_REVISION - C1980004 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2019 12:24:49 PM
Creation date
12/28/2018 5:00:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
12/28/2018
Doc Name Note
Emailed
Doc Name
Application
From
JE Stover & Associates, Inc.
To
DRMS
Type & Sequence
MR60
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - - Date: / / <br />Permittee: <br />Street: <br />City: <br />State: Zip Code: - <br />Brief Description of Revision: <br />Public Notice Attached: Yes No (Required for PRs and TRs) <br />Bond Increase: Yes No Federal Non-Federal Mine <br />Proposed Change in: <br />Permit Area - Surface Ownership - <br />Disturbed (+/-) . Acres Private Land (+/-) . Acres <br />Permit (+/-) . Acres Federal Land (+/-) . Acres <br />Affected (+/-) . Acres State Land (+/-) . Acres <br />Mineral Ownership - <br />Mineral Private (+/-) .Acres Mineral State (+/-) . Acres <br />Mineral Federal (+/-) . Acres
The URL can be used to link to this page
Your browser does not support the video tag.