My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-26_HYDROLOGY - M1978039HR
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1978039
>
2018-12-26_HYDROLOGY - M1978039HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 7:33:44 AM
Creation date
12/26/2018 4:11:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978039HR
IBM Index Class Name
HYDROLOGY
Doc Date
12/26/2018
Doc Name Note
Groundwater Chemistry Data
From
Western Water & Land, Inc.
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well MW-Sunl <br /> Form No. OFFICE OF THE STATE ENGINEER <br /> GWS-25 COLORADO DIVISION OF WATER RESOURCES <br /> 818 Centennial Bldg., 1313 Sherman St., Denver,Colorado 80203 <br /> (303)866-3581 <br /> AUTH <br /> WELL PERMIT NUMBER 287951 - - <br /> DIV 7 WD_71 IDES- BASIN <br /> APPLI <br /> APPROVED WELL LOEATIO <br /> SAN`MIGUEL`•COUNTY' ' <br /> NE '1/4 NW'; 1/41, Section 26 <br /> DENISON MINES (USA)CORP Township 44 N Range-18 W ' New Mex P.M.: <br /> 1050 17TH ST, SUITE 950 DISTANCES FROM SECTION LINES <br /> DENVER, CO 80265- Ft. from Section Line <br /> Ft.from Section Line <br /> (303)628-7798 UTM COORDINATES (Meters,Zone:13,NAD83) <br /> PERMIT TO CONSTRUCT A WELL Easting: Northing: <br /> ISSUANCL OF THIS`PERMIT DOES NOT CONFER`A WATER RIGHT <br /> CONDITIONS OF APPROVAL <br /> 1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit <br /> does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from <br /> seeking relief in a civil court action. <br /> 2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402-2,unless approval <br /> of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation <br /> Contractors in accordance with Rule 18. <br /> 3) Approvedpursuant to CRS 37-92-602(3)(b)(1)for uses as described.in CRS 37-92-602(1)(f). Use.of this well is limited to <br /> monitoring,water levels and/or-water-.quality-,sampling. <br /> 4) This well must be equipped'with a locking'cap-or•seal t©ipreventwetl.contamination or possible hazards as an open:'well , <br /> The well must be kept capped and locked at all times except during sampling or r measuring. <br /> 5) Records of water level measurements and water quality analyses shall.bemaintained by the well owner and sutirriitted to <br /> the Division of Water Resources upon request. <br /> 6) Upon conclusion of the monitoring program the well owner shall plug this well in accordance with Rule 16,of the Water <br /> Well Construction Rules. A Well Abandonment Report must be completed and submitted to the Division of Water <br /> Resources within 60 days of plugging. <br /> 7) The owner shall mark the well in a conspicuous place with the well permit number and name of aquifer as appropriate, <br /> and shall take necessary means and precautions to preserve these markings. <br /> 8) This well must be constructed by or under the supervision of a licensed well driller or other authorized individual according <br /> to the Water Well Construction Rules- If non-standard construction is anticipated,a variance request must be submitted in <br /> accordance with Rule 18 and approved prior.to well construction. <br /> 9) A Well Construction and Test Report(Form GWS-31), including lithologic log must be submitted by the individual <br /> authorized to construct the well. For non-standard construction,the report must include an as-built drawing showing <br /> details such as depth,casing, perforated zones,and a description of the grouting type and interval. <br /> 10) Pursuant to Rule 6.2.3 of the Water Well Construction Rules,the well construction contractor shall submit the as-built well <br /> location on work reports required by Rule 17.3 within 60 days of completion of the well. The measured location must be <br /> accurate to 200 feet of the actual location. The location information must include a GPS location.(UTM coordinates) <br /> pursuant.to the Division of Water Resources'guidelines. <br /> p p , under a future.. <br /> NOTE: Issuancp,of this,permit does not;guarantee that this well can be.conve.rted to a reduction well <br /> permit..,Additionally.,pursuant,to Rue-14,2 of the.Water Well-Construc#on,Rules(2CCR.402-2),monitoring holes <br /> constructed.pursuant to a monitoring'.hole.notice shall tidt-be:'converted to a'production welh ,(Upon:obtaining;A permit from <br /> the State Engineer,a monitoring hole may be converted to nitoring well,recovery well for remediation of;the.aquifer or.;. _. <br /> APPROVED &r4�L <br /> JST <br /> State Engineer BYATION <br /> ,Receipt No.9703232 DATE ISSUED 04-11-2012 DATE 04-11-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.