Laserfiche WebLink
4.0 RECLAMATION............................................................................................................33 <br /> 4.1 Recreational Criteria .........................................................................................................33 <br /> 4.2 Revegetation Criteria ........................................................................................................33 <br /> 5.0 WATER STORAGE RESERVOIRS ..............................................................................35 <br /> TABLES <br /> Table 2.1 Riverbank Berm Top Width...............................................................................................27 <br /> Table 2.2 Lateral Berm Top Width....................................................................................................28 <br /> FIGURES <br /> Figure 2.1 Typical Minimum Maintenance Alignment..........................................................................9 <br /> Figure 2.2 Typical Riprap Slope Protection........................................................................................ 13 <br /> Figure 2.3 Typical Soil Riprap Slope Protection................................................................................. 13 <br /> Figure 2.4 Jetty Slope Protection....................................................................................................... 14 <br /> Figure 2.5 Typical Riprap Slope Protection (Pitside Slope)............................................................... 19 <br /> Figure 2.6 Typical Soil Cement Slope Protection (Pitside Slope)...................................................... 19 <br /> Figure 2.7 Typical Grouted Boulder Slope Protection (Pitside Slope)...............................................20 <br /> Figure 2.8 Riprap Spillway Stabilization.............................................................................................20 <br /> Figure 2.9 Concrete Spillway Stabilization.........................................................................................21 <br /> Figure 2.10 Soil Cement Spillway Stabilization....................................................................................21 <br /> Figure 3.1 Typical Instream Headcutting Control Structure...............................................................32 <br /> January 2013 Urban Drainage and Flood Control District Page ii <br />