Laserfiche WebLink
ISSUED FOR CONSTRUCTION . <br /> GP RESOURCES , LLC <br /> West Farm Pit <br /> =N,� <br /> r77 p�cECi Slurr Wall & Reservoir Construction Plans ° X <br /> a <br /> y ° °LLy <br /> Q o <br /> U y aN <br /> C J� <br /> LOCATED IN o <br /> TOWNSHIP 22 SOUTH, RANGE 48 WEST, 6th P.M. <br /> COUNTY of PROWERS STATE of COLORADO W, <br /> GENERAL NOTES: APRIL, 2013 <br /> 1. THESE CONSTRUCTION PLANS ARE TO BE USED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS PREPARED BY ,,g„ „ • .. , ,:; . - SHEET INDEX •� R <br /> J&T CONSULTING, INC., AND GEOTECHNICAL INVESTIGATION AND ENGINEERING DESIGN RECOMMENDATIONS PREPARED BY '` =+ <br /> CESARE, INC. IL <br /> �" <br /> 1 Cover Sheet rA <br /> 2. COMPLY WITH ALL REQUIREMENTS OF OWNER OBTAINED PROJECT PERMITS: INCLUDING, BUT NOT UMIIED TO, PERMITS „„;` a ' asAe. K+"��,•• 2 Geotechnical Information _ <br /> FROM THE U.S. ARMY CORPS OF ENGINEERS AND COLORADO DEPARTMENT OF HEALTH AND ENVIRONMENT. CONTRACTOR �.,,, a ♦.. D <br /> SHALL OBTAIN ALL OTHER PERMITS NECESSARY FOR CONSTRUCTION OF THE WORK. 90 3 Site, Reservoir Grading, 8[ Boring Location Plan 0 <br /> 3. PROTECT ALL EXISTING WETLANDS. �' ,• M 4 Slurry Wall Horizontal & Vertical Control <br /> 4. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING EROSION AND SEDIMENT CONTROL MEASURES "++� '"*• - r �' 5-9 Slurry Wall Plan and Profiles C)w <br /> AT ALL TIMES DURING CONSTRUCTION. <br /> r* U) <br /> 5. ALL CONSTRUCTION ACTIVITIES MUST COMPLY WITH THE STATE OF COLORADO PERMITTING PROCESS FOR "STORM WATER ' '^° la ,.� „_ ,, "' - • T i C <br /> DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY." FOR INFORMATION, PLEASE CONTACT THE COLORADO 'SIT - L o <br /> DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, 4300 CHERRY DRIVE SOUTH, DENVER. COLORADO _ = V <br /> 80246-1530. ATTENTION: PERMITS SECTION. PHONE 303-692-3500. - N <br /> Ws 6. IF DEWATERING IS REQUIRED, A STATE CONSTRUCTION DEWATERING DISCHARGE PERMIT IS REQUIRED FOR DISCHARGES "^" 4 5w <br /> TO A STORM SEWER, CHANNEL, IRRIGATION DITCH, ANY STREET THAT IS TRIBUTARY TO THE AFOREMENTIONED FACILITIES �$ <br /> OR ANY WATER OF THE UNITED STATES. Q „MA <br /> IF. <br /> R � <br /> 7. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT ALL UTIUTIES TO COORDINATE `T LEGEND: <br /> SCHEDULES PROPERTY LINE V <br /> - - SECTION LINE <br /> 8. THE CONTRACTOR SHALL REGULARLY PATROL THE PUBLIC LANDS ADJACENT TO THE PROJECT, REMOVE CONSTRUCTION a>-°I'" 1.: J <br /> DEBRIS AND KEEP AREAS CLEAN AND SAFE. _ * * FENCE UNE <br /> IL <br /> -�- <br /> ' -0E-- OVERHEAD ELECTRIC UNES r r <br /> 9. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AND IMPLEMENTING A SEQUENCE AND SCHEDULE FOR COMPLETION ' t ,T' -T-- UNDERGROUND TELECOM LINE 41 <br /> OF THE WORK IN ACCORDANCE WITH APPLICABLE PROVISIONS OF THE CONTRACT DOCUMENTS. UNDERGROUND GAS LINE i <br /> 10.READ THOROUGHLY AND BECOME FAMILIAR WITH THE SPECIFICATIONS AND INSTALLATION DETAILS FOR THIS RELATED '# -^^' -SAN FM-- EXISTING SANITARY FORCE MAIN <br /> WORK PRIOR TO CONSTRUCTION. MINING LIMIT O <br /> 11. VERIFY SITE ELEVATIONS PRIOR TO CONSTRUCTION. "'" -------------- DIRT ROAD y <br /> a � <br /> 12.THE CONTRACTOR SHALL PROCURE ALL PERMITS AND LICENSES, PAY ALL CHARGES AND FEES INCLUDING, BUT NOT r^ .� ,`, �,, _ - WATER/DITCH EXISTING W H <br /> ____--EXISTING CONTOURS-_-_- <br /> LIMITED T0, ALL INSPECTION CHARGES OF AGENCIES HAVING APPROPRIATE JURISDICTION. _` "` ` .a -�- <br /> cc <br /> 13.CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF ENTIRE PROJECT, AS SPECIFIED, UPON FINAL COMPLETION OF � 'MOO- PROPOSED CONTOURS O <br /> PROJECT. <br /> FUTURE HIGHWAY REALIGNMENT PARCEL- - - - - <br /> PERMIT BOUNDARY <br /> ® ELECTRIC RISER BOX <br /> SEDIMENT AND EROSION CONTROL: �� "` �� ' GUY WIRE <br /> 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEDIMENT AND EROSION CONTROL AT THE SITE THROUGHOUT POWER POLE <br /> +q Diu. <br /> CONSTRUCTION. 77 WATER PUMP <br /> 2. BEST MANAGEMENT PRACTICES (BMP'S) SHALL BE USED AS NECESSARY TO ADDRESS SEDIMENT AND DUST FROM SITE •. ,. ..; ------------ PHASELIMITS <br /> DISTURBANCE. ADDITIONAL MEASURES MAY BE REQUIRED AT THE DIRECTION OF THE ENGINEER. # x, sz•• 0 BORING LOCATION <br /> " o <br /> n <br /> e •3. BMP'S MAY INCLUDE, BUT ARE NOT LIMITED T0: SLURRY WALL DELINEATION POST Z o Y '� O <br /> MINIMAL DISTURBANCE FOR MINIMAL TIME PERIODS <br /> GRAVEL CONSTRUCTION ENTRIES _ W <br /> SILT FENCE, STRAW BALE OR SAND BAG BARRIERS, ROCK CHECK DAMS 1" 500 0 1" Ir <br /> STORM SEWER INLET PROTECTION VICINITY MAP <br /> SEDIMENT CAPTURE PONDS �' ��/ED Y <br /> SITE WATERING FOR DUST SUPPRESSION SCALE 1" = 1000 U <br /> R <br /> SCALE IN FEET <br /> 4. BMP'S SHALL BE MAINTAINED AND KEPT IN GOOD REPAIR FOR THE DURATION OF THE PROJECT. THE CONTRACTOR SHALL m <br /> INSPECT BMP'S WEEKLY AND AFTER SIGNIFICANT (GREATER THAN 0.1" PRECIPITATION) STORM EVENTS. THE MAINTENANCE DEC 1. F 2018 <br /> AND REPAIR SHALL BE COMPLETED IN A TIMELY MANNER. SEDIMENT AND DEBRIS SHALL BE REMOVED WHEN THEY REACH <br /> HALF THE BMP HEIGHT OR IMPACT THE FUNCTION OF THE BMP. OWNER SURVEYOR GEOPHYSICAL SURVEY CLAMATIONe o <br /> GP Resources, LLC Bear Crook Surveying, Inc. Zapata Incorporated DIV�siv:� `�` <br /> 5. SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING AND Karl Nyquist 402 Santa Fe Ave., Ste. 108 301 Commercial Rd., Ste. B MINING SAFETY-MINERALS z <br /> PERIMETER SILT FENCING. SOILS THAT WILL BE STOCKPILED FOR MORE THAN 30 DAYS SHALL BE MULCHED AND SEEDED <br /> WITH A GRASS COVER WITHIN 14 DAYS OF STOCKPILE CONSTRUCTION. 7991 Shaffer Parkway, Ste. 200 Lo Junta, CO 81050 Golden, CO 80401 FEE REPORT MAP <br /> Littleton, CO 80127 303-659-1532 303-278-8700 <br /> 6. THE CONTRACTOR SHALL INSURE THAT ALL LOADS OF CUT AND FILL SOILS IMPORTED TO OR EXPORTED FROM THE SITE 303-369-5100 <br /> ARE PROPERLY LOADED AND COVERED TO PREVENT LOSS DURING TRANSPORT. ?�j•�SC.}-O'�P``o�s <br /> 7. THE CONTRACTOR SHALL REMOVE ALL SEDIMENT, MUD, AND CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT ENGINEER GEOTECHNICAL/SOIL 36 46 <br /> FROM FLOWUNES AND PAVEMENT OF PUBLIC STREETS IN A TIMELY MANNER. J&T Consulting, Inc. INVESTIGATIONS <br /> 8. SOILS EXPOSED DURING LAND DISTURBING ACTIVITY SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR J.C. York g% 530.1 <br /> DISCING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION OR OTHER PERMANENT EROSION CONTROL IS IN PLACE. NO 305 Denver Ave., Ste. D Comoro,S Alton Wa, Bld B En ineer's Certification <br /> Fort Lupton, CO 80621 Y 9• g ,,,�Inm„����• <br /> SOILS SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED 303-857-6222 Centennial, CO 80112 I hereby certify that these plans for the construction of the West Farm Pit <br /> TEMPORARY OR PERMANENT EROSION CONTROL IS INSTALLED UNLESS OTHERWISE APPROVED. Fax: 303-857-6224 303-220-0300 Slurry Wall and Reservoir were prepared by me or under my direct <br /> Joea 07115 <br /> 9. ALL TEMPORARY SEDIMENT CONTROLS WILL BE REMOVED WITHIN 30 DAYS AFTER THE FINAL STABILIZATION IS ACHIEVED supervision for GP Resources, LLC. Do. 411113 <br /> OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, WHICHEVER OCCURS FIRST. D.-By wSS <br /> 10.NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED WHENEVER POSSIBLE. EXPOSURE OF SOIL TO EROSION BY oo nods TPY <br /> REMOVAL OR DISTURBANCE OF VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION Checked 13Y JCY <br /> As Shown <br /> OPERATIONS AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. v�fftS belaw s S.care J7-Cover <br /> sSho n <br /> wn <br /> E2CflF'2 r3• James C. York, P.E. <br /> Colorado Registration No. 36846 Sheet: Of: <br /> 1 g <br />