All local, State, and Federal rules and regulations will be followed for the storage and handling <br /> of any fuel for the facilities. <br /> Mine Phasinq <br /> Prowers Aggregate Operators, LLC anticipates mining and reclaiming the West Farm Pit site in <br /> 17 phases, progressing through the phases as shown on the Mining Plan Map. The overall time <br /> required to complete the mining and reclamation is estimated to be 15 to 30 years. Initial <br /> production is expected to be 500,000 tons per year with a possible maximum future production <br /> rate of 1,500,000 tons per year. However, it is possible that due to demand fluctuations, mining <br /> could progress slower than anticipated and additional time may be required for mining and <br /> reclamation of the site. <br /> The mining and reclamation of Phases 1-4 is complete. Using a production rate of 1,000,000 <br /> tons per year Phases 5-12 are estimated to be mined according to the following sequence and <br /> timeline: <br /> Phase Estimated Time Estimated Total <br /> Sequence Required to Mine Mining Time <br /> Phases (years) <br /> ears <br /> 1-4 MiningCom lete 0 years <br /> 8,11 2 years 2 years <br /> 7,10 2 years 4 years <br /> 5,6 2 years 6 years <br /> 9,12 2 years 8 years <br /> At this time Phases 13 through 17 in the south mining area will be used only for stockpiling and <br /> sediment ponds. They are planned to be mined in the future. Prior to mining the south mining <br /> area PAO commits to submitting a technical revision to provide the mining timetable for these <br /> phases. <br /> Prowers Aggregate Operators,LLC. <br /> JAT Consulting,Inc. West Farm Pit—M-2008-078 <br /> DRMS 112 Permit Amendment Application <br />