RE. Prowers Aggregate Operators, LLC. - West Farm Pit-Permit No. M-2008-078 <br /> 112c Permit Amendment Application (Revision No. AM-01) <br /> Preliminary Adequacy Review Response 12121118 <br /> -4- <br /> Response: The maximum disturbed area is 272.58 acres. In the Parcel A permit <br /> area this includes the western wash plant, sediment pond, and stockpile area, the <br /> parking area on the north side of the site, the disturbed areas adjacent to the pit <br /> road in the north mining area and along the ditch to the river north of the pit, the <br /> area west of the pit entrance road(including scale house area), Phases 1-4 of the <br /> north mining area (that have been reclaimed), Phases 5-12 of the north mining <br /> area (active mining area), Phases 13-17 of the south mining area (stockpiles area), <br /> the stockpile area in the south mining area, and the entire Parcel B permit area <br /> south of County Road Hh.5. <br /> 15) Pursuant to Rule 6.4.4(e), please provide an approximate timetable for the proposed <br /> phases of mining including estimated disturbance acreage amounts for each phase. Please <br /> be sure this mining timetable correlates with the reclamation timetable in Exhibit E. <br /> Response: As mentioned in the original amendment application, the mining <br /> production rate is expected to range from 500,000 tons per year to 1,500,000 tons <br /> per year. The mining and reclamation of Phases 1-4 is complete. Using a <br /> production rate of 1,000,000 tons per year Phases 5-12 are estimated to be mined <br /> according to the following sequence and timeline: <br /> Phase Estimated Time Estimated Total <br /> Sequence Required to Mine Mining Time <br /> Phases (years) <br /> ears <br /> 1-4 Mining Complete 0 years <br /> 8,11 2 years 2 years <br /> 7,10 2 years 4 years <br /> 5,6 2 years 6 years <br /> 9,12 2 years 8 ears <br /> At this time Phases 13 through 17 in the south mining area will be used only for <br /> stockpiling and sediment ponds. They are planned to be mined in the future. Prior <br /> to mining the south mining area PAO commits to submitting a technical revision <br /> to provide the mining timetable for these phases. See the attached revised Exhibit <br /> D narrative. <br /> 16) Please provide more details on the future conveyor shown on the Exhibit C - Pre- <br /> Mining/Mining Plan Map which is oriented northeast-southwest from the wash plant to Co <br /> Rd HH.5. Please provide its approximate dimensions, and any permanent structures <br /> associated with its construction (i.e. concrete footing). Would this conveyor cross Co Rd <br /> HH.5 to Parcel B? If so, would the portion of the conveyor crossing the road be covered to <br /> prevent sand from spilling onto the road? Additionally, would this specific activity require <br /> any additional permitting with the county? <br /> Response: At this time PAO has decided not to install any conveyor from the <br /> wash plant to the south and it has been removed from the map. PAO will submit a <br /> technical revision to the permit including details of the structures if they decide to <br /> install any permanent conveyor structures within the permit area. <br /> 17) Please provide more details on the activities to occur in Parcel B during operations. <br /> Response: Sand and gravel products will be stockpiled in the Parcel B area for <br /> loading onto rail cars on the rail spur on the south side of the parcel. Sand and <br /> V 305 Denver Avenue-Suite D•Fort Lupton CO 80621 •Ph: 303-857-6222•Fax: 303-857-6224 <br />