Laserfiche WebLink
RE: Prowers Aggregate Operators, LLC. - West Farm Pit-Permit No. M-2008-078 <br /> 112c Permit Amendment Application (Revision No. AM-01) <br /> Preliminary Adequacy Review Response 12121118 <br /> -16- <br /> agreement is being negotiated with the City of Lamar. See the attached agreement <br /> and Fedex overnight tracking information. <br /> Additional Items: <br /> 47) For the West Farm Seepage and Rapid Drawdown/Slope Stability Analyses prepared by <br /> Cesare, Inc. (dated March 21, 2013) and the Data Report, Seepage, Rapid Drawdown, and <br /> Slope Stability Analyses also prepared by Cesare, Inc. (dated February 2, 2016), please <br /> provide a site map showing locations of the sections analyzed. <br /> Response: See the attached slope stability section location map. <br /> 48) Please provide a stability analysis for the proposed slurry wall to be installed in the South <br /> Mining Area (similar to the ones submitted for the North Mining Area slurry walls), or <br /> commit to providing the analysis prior to its installation. <br /> Response: PAO commits to providing a slope stability analysis for the proposed <br /> slurry wall in the south mining area prior to its installation. <br /> Thank you for your consideration of our responses to the comments. Please feel free to contact <br /> me with any questions or if you need additional information. <br /> Sincerely, <br /> I. e- <br /> J.C. York, P. <br /> J&T Consulting, Inc. <br /> Attachments- <br /> 1. Revised Exhibit C-1 Pre-Mining/Mining Plan Map <br /> 2. Reseeded Sediment Pond Area Photos(2) <br /> 3. Special Warranty Deed <br /> 4. Conservation Easement Deeds <br /> 5. Exhibit C-2 Pre-Mining/Mining Plan Map <br /> 6. Phase 1 Slurry Wall Final Construction Drawings <br /> 7. Phase 2 Slurry Wall Final Construction Drawings <br /> 8. Soil-Bentonite Slurry Walls Specification <br /> 9. Revised Exhibit D Narrative <br /> 10. Concrete Rundown and Floating Pump Station Photos(3) <br /> 11. Revised Exhibit F Reclamation Plan Map <br /> 12. Revised Exhibit E Narrative <br /> 13. Reservoir Water Balance Accounting Spreadsheet <br /> 14. Revised West Farm Pit Stormwater Management Plan <br /> 15. West Farm Pit Substitute Water Supply Plan and Accounting Spreadsheet <br /> 16. Figure Exhibit G-1 <br /> 17. Flood Insurance Study, Prowers County and Unincorporated Areas <br /> 18. Flood Insurance Rate Maps(3) <br /> 19. Excerpts from"Technical Review Guidelines for Gravel Mining &Water Storage Activities Within or Adjacent to 100-Year <br /> Floodplains"by Urban Drainage&Flood Control District <br /> 20. Exhibit L Reclamation Phasing Map <br /> 21. Revised Exhibit L Narrative and Reclamation Cost Summary Table <br /> 22. Reclamation Bond Estimate Calculations and Phase 2 Slurry Wall Construction Cost Data <br /> 23. Centurytel Agreement and Certified Mail Receipt <br /> 24. Rasmussen Certified Mail Tracking Information <br /> 25. AT&SF Structure Agreement and Certified Mail Receipt <br /> 26. Revised Exhibit S <br /> 27. Prowers County Road Department Agreement for Use and Maintenance of County Roads <br /> 28. City of Lamar Agreement and Fedex Overnight Tracking Information <br /> 29. Slope Stability Section Location Map <br /> V 1 305 Denver Avenue—Suite D•Fort Lupton CO 80621 •Ph: 303-857-6222•Fax: 303-857-6224 <br />