My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-20_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2018-12-20_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 4:49:44 AM
Creation date
12/20/2018 4:16:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/20/2018
Doc Name
Addendum To Application
From
CC&V
To
DRMS
Type & Sequence
TR107
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONTN'ewmontW nlikp,Corporation <br /> Cripple Creek&Victor Gold Mhrie <br /> i00!J;i'St <br /> P O Box 191 <br /> Victor, Cc 80860 <br /> SENT CERTIFIED RETURN RECEIPT REQUESTED RECEIVED <br /> 7018 0680 0000 4627 6313 DEC 20 2018 <br /> December 18, 2018 SON OF RECLAMATioN <br /> Mr. Timothy Cazier, P.E. M0-FETY <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation,Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company; Cresson Project; <br /> Addendum to TR 107—Arequa Gulch Phase II Solution Flow Modification <br /> Dear Mr. Cazier: <br /> Newmont Mining Corporation - Cripple Creek and Victor Gold Mining Company (CC&V) hereby <br /> submits an addendum to Technical Revision (TR) 107, Arequa Gulch Phase II Solution Flow <br /> Modification that was initially approved by the Division of Reclamation, Mining and Safety(DRMS) on <br /> November 15, 2018. <br /> CC&V proposes an update to Modification #3 as described in the approved TR 107. Lime slurry will be <br /> introduced through an existing tank at the Phase II Pumps and fed to the PSES through new piping <br /> located within the PSES to the Stabilization Tank Sump. The CoMag Clarifier underflow will be pumped <br /> into the Gravity Thickener and filter pressed. The filter pressed material, or PSES Solids, will be loaded, <br /> transported, and placed on the Valley Leach Facilities (VLFs) as described in the original TR. The <br /> associated Figures 6 and 7 have been updated and included to reflect this proposed addendum. <br /> Should you require further information please do not hesitate to contact Katie Blake via phone or email at <br /> 719.689.4048 and Katie.Blake("a;newmont.com, or me at 719.689.4042, or Justin.Raglin(ci)newmont.com. <br /> Sincerely, <br /> Justin Raglin <br /> Senior Environmental Manager <br /> Cripple Creek&Victor Gold Mining Co <br /> JR/kb <br /> Cc:D.Williams—Teller County <br />
The URL can be used to link to this page
Your browser does not support the video tag.