Laserfiche WebLink
compared to the background image on the maps. Please depict the correct location <br /> of this canal road and re-submit these maps. Location of access road has been <br /> corrected. See included maps. <br /> EXHIBIT C - Pre-mininiz and Mining Plan Mav(s) of Affected Lands (Rule 6.4.3): <br /> 5. None of the Exhibit C Maps contain information regarding structures as required <br /> by Rule 6.4.3(g). Please revise one of the Exhibit C Maps or submit a new Exhibit <br /> C Map which identifies the location of all permanent man-made structures <br /> contained on the area of affected lands and within 200 feet of the affected lands. <br /> The structure owner's name and type of structure must also be identified on the <br /> map. Labels added to Exhibit C Maps. <br /> EXHIBIT D - Mining Plan (Rule 6.4.4): <br /> 6. The Applicant proposes to have a phased mining/bonding operation. Please <br /> commit to contacting the Division for approval prior to advancing into an un- <br /> bonded phase. The request will include the estimated reclamation costs that would <br /> be required for opening the additional phase. The Division will review and <br /> calculate a new finical warranty amount, issuing a Surety Increase revision if <br /> necessary. Once the additional amount is posted the Operator will be approved for <br /> the new phase. Please note, the Applicant may submit a Surety Reduction request <br /> for specific reclamation tasks completed in previous or an Acreage Reduction <br /> request for portions of the affected lands where final reclamation has been <br /> achieved. Released amounts of financial warranty from these requests could be <br /> used to help off-set reclamation costs associated with the new phase. The <br /> Applicant commits to notifying the Division prior to expanding into <br /> additional phases and adjusting the Surety as needed. <br /> EXHIBIT E - Reclamation Plan (Rule 6.4.5): <br /> 7. The Applicant states the proposed reclamation plan is based on the Reclamation <br /> Plan developed by the District Conservationist of the NRCS Pueblo Field Office. <br /> After a review of the proposed reclamation plan and the NRCS Plan, the Division <br /> has discovered a discrepancy between the plans regarding subsoil. The proposed <br /> reclamation plan is silent on the subsoil replacement while the NCRS Plan <br /> recommends at least 18 inches of subsoil to be replaced prior to topsoil <br /> replacement. Typically, the Division has approved reclamation plans for similar <br /> operations in the area which utilize overburden and processing fines as the subsoil <br /> component. Please address this discrepancy and either commit to implementing <br /> the NRCS recommendations or submit an appropriate technical justification for <br /> the deviation in the plan. 6.4.5 (2) has been revised to include 18" of subsoil. <br /> 8. Similar to Adequacy Item No. 7, the Division discovered a discrepancy between <br /> the plans regarding topsoil replacement. The proposed reclamation plan states <br /> topsoil will be replaced at a depth of 1" to 6" while the NRCS plan recommends <br /> page 2 of 4 file kJ:\2017\=BigG\DRMS-permit\Comments\BigG-adequacy-response-2018.doc) <br />