Laserfiche WebLink
RULE6.4.11 EXHIBIT"L" <br /> RECLAMATION COST INCLUDES PHASES 1 &2 <br /> BIG "G" GRAVEL PIT <br /> QTY. UNIT UNIT COST EXTENDED COST <br /> 1.) REDUCE REMAINING HIGH WALL 2800 LF $5.50 $15,400 <br /> 2.) REPLACE OVERBURDEN 7000 LCY $1.00 $7,000 <br /> 3.) PLACE TOPSOIL OVER AREA 42000 LCY $2.00 $84,000 <br /> 4.) SCARIFY THE HARDPAN 10 ACRE $130.00 $1,300 <br /> 5.) SEED BED PREPARATION 76.2 ACRE $200.00 $15,240 <br /> 6.) FERTILIZER APPLICATION 76.2 ACRE $150.00 $11,430 <br /> 7.) SEEDING DRILLING METHOD SEED INCLUDED 76.2 ACRE $250.00 $19,050 <br /> 8.) MULCHING W/ HAY OR STRAW 76.2 ACRE $165.00 $12,573 <br /> 9.) WEED CONTROL ALLOWANCE 76.2 ACRE $25.00 $1,905 <br /> 10.) REMOVE ASPHALT PAVING 500 CY $5.00 $2,500 <br /> 11.) MOBILIZATION & DEMOBILIZATION 2 EA. $10,000.00 $20,000 <br /> TOTAL DIRECT COST $190,398 <br /> INDIRECT COST <br /> PUBLIC LIABILITY INSURANCE 1.55% $2,951.17 <br /> CONTRACTOR PERFORMANCE BOND COST 1.55% $2,951.17 <br /> CONTRACTOR PROFIT 10.00% $19,039.80 <br /> DIVISION OF MINERALS &GEOLOGY ADMIN. EXPENSE 5.00% $9,519.90 <br /> ADDITIONAL SUPERVISION 3.00% $5,711.94 <br /> TOTAL PERFORMANCE BOND AMOUNT $230,571.98 <br />