Laserfiche WebLink
Since the expected effect on the river flows is small, no alternate water supply should be needed for downstream <br />surface water users. However, if any significant decrease in river flows from the mining is ever proven, EC will <br />prepare an augmentation plan using their Worthington Ditch water rights of four-(4) cfs. <br />Permit Revision 04-34 2.04-25 Revised 7/2/04 <br />