My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-13_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2018-12-13_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 11:45:11 AM
Creation date
12/20/2018 10:53:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
12/13/2018
Doc Name
Quarterly Fill Inspection Report
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Annual Report Year
2018
Report Quarter_Month
4
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT - SOUTH TAYLOR FILL <br />(Including Both the East Taylor and West Taylor Fill Segments) <br />INDICATE QUARTER --> 1sT p 2ND p 3RDQ 4TH X 2018 <br />YEAR <br />ALL QUARTERS NEED TO BE CERTIFIED �F <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No NA Yes <br />If yes, explain: <br />Date of Survey: NA <br />Reviewed By: Lee Sampson, Curt Blunt <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 225.4 feet If yes, explain: <br />Date of Measurement: 12-6-18 <br />Measured By: Lee Sampson, Kurt Blunt <br />3) Has there been any evidence of surFicial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 12-6-18 <br />Inspected By: Lee Sampson, Kurt Blunt <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 12-6-18 <br />Inspected By: Lee Sampson, Kurt Blunt <br />`,`1111111111110, / <br />0 l <br />-� 47031 <br />a <br />NA <br />'s''���� 0111111► 1O,`s�,` <br />I am a Registered Professional Engineer in the State of Colorado. Being familiar with the Colowyo operation, and relying on the <br />information provided to me by Colowyo Personnel, the West and East Taylor Fill are observed to be stable, at the time of inspection. <br />Construction activities related to the West and East Taylor Fill are in conformance, to the best of my knowledge and experience, as <br />specified in the Introductory pages and the associated report found in Volume 13, Exhibit 21, Item 1, and other applicable <br />requirements of the approved permit documents, a portion of CORMS Permit C-1961-019. <br />
The URL can be used to link to this page
Your browser does not support the video tag.