Laserfiche WebLink
INSPECTION REPORT - WEST PIT FILL <br />INDICATE QUARTER 1STEl 2110 El 3RD Ll 4TH X 2018 <br />YEAR <br />*ALL QUARTERS NEED TO 8E CERTIFIED* <br />THE FOLLOWING ITEMS ARE TO RE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No X Yes <br />If yes, explain: <br />Date of Survey: 11-8-18 by Kendal Beaman <br />Reviewed By: Lee Sampson <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 82.2 ft. <br />If yes, explain: <br />Date of Measurement: 12-6-18 <br />Measured By: Lee Sampson, Kurt Blunt <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 12-6-18 <br />Inspected By: Lee Sampson, Kurt Blunt <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 12-6-18 <br />Inspected By: Lee Sampson, Kurt Blunt <br />�0 L <br />a---47031 <br />I am a Registered Professional Engineerin the State of Colorado. Being familiar with the Colowyo operation, and relying <br />on the information provided to me by Colowyo Personnel, the west Pit Excess Spoil Fill is observed to be stable, at the <br />time of inspection, and in compliance with CDRMS Rule 4.09.1(1)(c) and Rule 4,09.1(11) , and Permit C-1981-019. <br />