Laserfiche WebLink
December 13, 2018 <br />Horse Gulch Fill Quarterly Inspection Report <br />Fourth Quarter 2018 <br />Table of Contents <br />1.0 Introduction 2 <br />2.0 Critical Construction Periods 4 <br />2.1 <br />Removal of All Organic Material and Topsoil 4 <br />2.2 <br />Placement of Underdrainage Systems 4 <br />2.3 <br />Installation of Surface Drainage Systems 4 <br />2.4 <br />Placement and Compaction of Fill Materials 4 <br />2.5 <br />Revegetation 6 <br />3.0 References <br />certify that this report was prepared by me. <br />6 <br />1 <br />111111fI11111!!!!!�r/i <br />•(SCF <br />�D�pDO <br />A����-, <br />49ii� <br />�o=PORiF <br />i <br />• <br />---1 �2(5 <br />Tonia Marie Perkins <br />=-v: 43864 <br />CO PE 43864�pc'. <br />�Z -�3 /�444 i� <br />Mining Engineer <br />Trapper Mining, Inc.,,��570 <br />% �`'•. : ���� <br />00*01;(: <br />1 <br />