My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-17_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2018-12-17_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2018 7:45:35 AM
Creation date
12/19/2018 7:43:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
12/17/2018
Doc Name Note
For SL1
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Permit Index Doc Type
Findings
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NHN SL1 <br />Borehole <br />Description Sealing/Item Method Diameter Length Quantity Unit Unit Cost Total Cost <br />Bottom Plug PVC plug - 4 in diameter <br />borehole 4"-3 EA $29.34 $88.02 <br />Fill holes with <br />Cement <br />Portland Cement grout (Bag, <br />material cost only…94 lb. bag)4"142 LF 13 bag $13.80 $179.40 <br />Cut Casing at <br />Surface <br />Exposed casing removal - <br />Calculate Circumference in <br />Linear Feet <br />4"1'3'LF $0.19 $0.57 <br />Borehole <br />Marker <br />Borehole <br />location/identification marker <br />(EA, material cost only) <br />NA NA 3 EA $3.47 $10.41 <br />Drill Rig Time Truck Mounted - 3.0in. - 500 ft <br />capy.NA NA 12 EA $144.07 $1,728.84 <br />Water Truck <br />Time Water Tanker, 2,500 Gal.NA NA 12 EA $87.67 $1,052.04 <br />Total $3,059.28 <br />Total Direct Cost 3059 <br />Total Hours 12 <br />Indirect Costs Cost <br />Liability Insurance 61.79$ <br />Performance Bond 32.12$ <br />Job Superintendent 438.36$ <br />Profit 305.90$ <br />Overhead and Profit 838.17$ <br />Contract Amount 3,897.17$ <br />Corporate Surety - 500 -$ <br />Engineering 77.94$ <br />Reclamation Management 74.44$ <br />Total Indirect 990.55$ <br />Total Bond Amount Required 4,049.55$ <br />(Direct + Overhead Profit) <br />- <br />2% of contract <br />1.91% of contract <br />2.02% <br />1.05% <br />50% hours @ $73.06/hour <br />10% <br />-
The URL can be used to link to this page
Your browser does not support the video tag.