Laserfiche WebLink
D. Name,address and phone number of any other lessees,assigns,agents,etc., and briefly describe their <br /> involvement with the operation,if applicable: <br /> NIA - <br /> III. PROPERTY OR AREA <br /> (Name of claim,if applicable,and the legal land description where the operation will be located.) <br /> MC# Name Section Township Range <br /> _288179 New Hawk 10 12S 71W <br /> 288116 Wildcat 10 12S 71W <br /> IV. DESCRIPTION OF THE OPERATION <br /> A. Access. Show on a map(USGS quadrangle map or a National Forest map, for example)the claim boundaries,if applicable, and <br /> all access needs such as roads and trails, on and off the claim. Specify which Forest Service roads will be used, where <br /> maintenance or reconstruction is proposed, and where new construction is necessary. For new construction, include construction <br /> specifications such as widths, grades, etc., location and size of culverts, describe maintenance plans, and the type and size of <br /> vehicles and equipment that will use the access routes. <br /> See attached location map#1 and map#2 for all access routes. Forest service roads used for access are indicated in <br /> black ink, whereas temporary access trails are indicated by light blue ink. <br /> 1)No new roads will be created for this mining operation. Pre-existing roads will be used for mining access(FS roads <br /> 201,752, 752A, 754,&754A). As such,all mechanized equipment(mid-sized backhoe)will be"walked in"from nearby <br /> 4wd forest service roads and along the access trails marked in blue on location map#2.To minimize disturbance,these <br /> "blue"access trails will only be used to transport mechanized equipment to the claim sites in the beginning of the mining <br /> season,and then walk the equipment out at the end of the season. <br /> 2)There will be 3 access routes(blue ink trails, map#2),totalling 965 feet in length X 12 feet in width. Access#1 will be <br /> 365 feet X 12 feet;Access#2 will be 200 feet X 12 feet,and Access#3 will be 400 feet X 12 feet. Each of these access <br /> trails will be temporary and will be recaimed when mining to that site is complete. Grade of the access routes will be <br /> less than 10%in each case. No culverts will be required,although water bars could be constructed if necessary. <br /> 3)Trash generated at each site will be picked-up and transported out on a routine basis,when vehicles return to town <br /> depending on the work schedule and the site. <br /> 4)We do not anticipate significant road disturbance,though minor maintenance(water bars)may be necessary to <br /> prevent significant disturbance of existing USFS roads to the claim sites(e.g., after a heavy rain). Any erosion that <br /> results from work performed on the claims will repaired and mitigated when found, <br /> 5)Reseeding of recontoured ground will be implemented as part of seasonal reclamation or"close-out". <br /> 6)Two one ton pick-up trucks,will be used for access. <br /> (If more space is needed ro fill out a brook of information,use additional sheets and attach form) <br /> -2- <br />