Laserfiche WebLink
NEWMONT Newmont Mining Corporation <br /> Cnrple C eel, 8 Victor Mine <br /> 100 i Box 19 <br /> PO o191 E <br /> Victor, CO 80860 C/`�,VP <br /> rJ <br /> mm newriont corn nr <br /> %S,Olor <br /> SENT CERTIFIED RETURN RECEIPT REQUESTEDING ��9F /gV <br /> 7018 0680 0000 4627 6191 <br /> December 6, 2018 <br /> Mr. Timothy Cazier, P.E. <br /> Environmental Protection Specialist " <br /> Colorado Department of Natural Resources <br /> Division of Reclamation,Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980-244; Cripple Creek& Victor Gold Mining Company; Cresson Project; <br /> Written Notification—Process Water Spill,November 30,2018 <br /> 4 <br /> Dear Mr. Cazier: <br /> In accordance with Rule 8, Section 8.2.3 of the Mineral Rules And Regulations of the Colorado Mined <br /> Land Reclamation Board For Hard Rock, Metal, And Designated Mining Operations (Rules), Newmont <br /> Mining Corporation - Cripple Creek and Victor Gold Mining Company (CC&V) hereby provides the <br /> Division of Reclamation, Mining and Safety (Division) with a formal report regarding the process water <br /> spill that occurred at the High Grade Mill(HGM) on November 30,2018. <br /> The following points address the requirements of Rule 8, section 8.2.3: <br /> a. Actions taken to respond to and correct the emergency situation or condition <br /> • At approximately 8:30 pm on November 30, 2018, a process water conveyance pipeline <br /> separated. The separation occurred on the West side of the HGM within the leach tank <br /> containment, which contained the majority of the water. Approximately 75 gallons of process <br /> water overtopped primary containment, but remained on the HGM pad. The process water <br /> consists of fresh water and sediment originating from the milling and filtering processes that <br /> occur in the HGM. No cyanide is utilized anywhere in the mill circuit, therefore there is no <br /> risk that the process water contains cyanide. <br /> • Upon discovery, the leaking conveyance pipeline was isolated and the separated pipe was <br /> repaired. <br /> • A skid steer was used to over-excavate the spill-impacted soil. <br /> • The excavated soil was transferred to the ore feed pile to be re-processed in the HGM. <br /> Approximately 3 cubic yards of soil was excavated in the cleanup efforts. Clean gravel was <br /> placed in the over-excavated area. <br />