My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-17_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2018-12-17_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 4:10:16 AM
Creation date
12/17/2018 11:30:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
12/17/2018
Doc Name
Water Monitoring - Groundwater
From
Battle Mountain
To
DRMS
Annual Report Year
2018
Report Quarter_Month
Nov
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2-Monthly Piezometer Elevations <br /> Monitoring Well Piezometer Depth Depth to Water Depth of Water <br /> Identification Observation Date ft ft ft <br /> P6 11/29/2018 72.46 DRY N/A <br /> P7 11/29/2018 92.50 92.30 0.20 <br /> P8 11/29/2018 97.51 96.65 0.86 <br /> P9 11/29/2018 72.30 71.98 0.32 <br /> P10 11/29/2018 58.30 57.57 0.73 <br /> PH 11/29/2018 41.80 41.39 0.41 <br /> P12 11/29/2018 41.71 41.69 0.02 <br /> P13 11/29/2018 41.34 41.03 0.31 <br /> P14 11/29/2018 41.24 DRY N/A <br /> P15 11/29/2018 41.10 40.86 0.24 <br /> The leak detection system at the TSF Collection Pond was inspected November 29, 2018. A total of 860 <br /> gallons (29.7 GPD) were evacuated from the leak detection system and pumped to the LTF. The LTF <br /> underdrain system flow was measured to be approximately 34.0 gallons per minute(gpm). <br /> West Pit Waste Water Treatment Plant <br /> During the month of November 2018, the West Pit Water Treatment Plant was operated under Colorado <br /> Department of Public Health and Environment(CDPHE)CDPS Permit No. C00045675 for discharge into <br /> the Rito Seco alluvial aquifer. During the month of November, 6,233,900 gallons (19.13 acre-feet) of <br /> treated water was discharged to the Rito Seco. There was 769,800 gallons (2.36 acre-feet) of water <br /> transferred from the West Pit to the LTF in November 2018. There was no sludge transferred from the <br /> water treatment plant drying pad to the LTF. <br /> BMRI performed the monthly visual seepage expression inspections on November 29,2018 in the historic <br /> seepage area identified in Figure 2 of the permit. No seepage expressions were observed in the historic <br /> seepage area during November 2018. <br /> BMRI measured the monthly West Pit backfill, alluvial and monitoring wells as required under in the <br /> QA/QC Plan. Measurements obtained for the monthly wells are shown in Table 3. <br /> Table 3-Monthly and Quarterly Groundwater Depth to Water <br /> Monitoring Well Identification Observation Date Depth to Water <br /> ft <br /> BF-4 11/29/2018 24.89 <br /> BF-5R 11/29/2018 30.82 <br /> BF-6 11/29/2018 30.92 <br /> M-6 11/29/2018 DRY <br /> M-7 11/29/2018 DRY <br /> M-8 11/29/2018 DRY <br /> M-9 11/29/2018 141.68 <br /> M-10 11/29/2018 25.59 <br /> M-11R 11/29/2018 38.22 <br /> M-12 11/29/2018 175.09 <br /> M-13R 11/29/2018 125.81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.